Free SWMS template
A SWMS (Safe Work Method Statement) is the document Australian law requires before any high risk construction work starts. It lists the high risk work involved, the hazards at each step, the controls that deal with them, and how those controls are checked. Fill in the template below and download it as Word or PDF. It's free, with no sign-up.
- No sign-up or email
- Word and PDF
- All 18 high risk work categories
- 16 trade examples
Fill in your SWMS
Start blank or from a trade example, change anything, and download. Everything stays in your browser.
Free, no sign-up. Your draft saves in this browser as you type.
Your SWMS is downloading.
Next time, keep it on the job. In Fieldmox the SWMS sits on the job with the quote, schedule and photos, so whoever is on site can find it, and you're not digging through email when the builder asks for it.
Book a meetingStep 1
The template and examples are a starting point. Check every step against your own job and site, talk it through with your crew, and follow your state's regulator if anything here differs.
What is a SWMS?
A Safe Work Method Statement (SWMS, said "swims") is a written plan for doing high risk construction work safely. It sets out the work step by step, the hazards in each step, and the controls the crew will use. Everyone doing the work reads and signs it before starting.
It isn't a general safety policy or a full risk assessment. It's a working document for supervisors and workers on site, so it should be short, specific to the job, and written in plain language the crew understands.
When do you need a SWMS? The 18 types of high risk construction work
You need a SWMS before construction work starts if it involves any of these. The list is regulation 291 of the model WHS Regulations, used in every state and territory except Victoria, which has its own near-identical list.
- 1 Work that involves a risk of a person falling more than 2 metres
- 2 Work that is carried out on a telecommunication tower
- 3 Work that involves demolition of an element of a structure that is load-bearing or otherwise related to the physical integrity of the structure
- 4 Work that involves, or is likely to involve, the disturbance of asbestos
- 5 Work that involves structural alterations or repairs that require temporary support to prevent collapse
- 6 Work that is carried out in or near a confined space
- 7 Work that is carried out in or near a shaft or trench with an excavated depth greater than 1.5 metres, or a tunnel
- 8 Work that involves the use of explosives
- 9 Work that is carried out on or near pressurised gas distribution mains or piping
- 10 Work that is carried out on or near chemical, fuel or refrigerant lines
- 11 Work that is carried out on or near energised electrical installations or services
- 12 Work that is carried out in an area that may have a contaminated or flammable atmosphere
- 13 Work that involves tilt-up or precast concrete
- 14 Work that is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians
- 15 Work that is carried out in an area at a workplace in which there is any movement of powered mobile plant
- 16 Work that is carried out in an area in which there are artificial extremes of temperature
- 17 Work that is carried out in or near water or other liquid that involves a risk of drowning
- 18 Work that involves diving work
If none of these apply, the law doesn't require a SWMS. You still have to manage the risks, and many builders and facility managers ask every contractor for one, so it's worth having.
What a SWMS must include
Under regulation 299, a SWMS must do four things, take account of the conditions at the workplace, and be set out so the people using it can understand it.
-
1
Identify the high risk construction work
Name which of the 18 categories the job involves.
-
2
State the hazards and risks
For each step of the work, what could hurt someone.
-
3
Describe the control measures
What the crew will do to eliminate or reduce each risk, most effective first.
-
4
Describe how the controls are implemented, monitored and reviewed
Who checks them, when, and what triggers a review.
If a fall of more than 2 metres is controlled only with administrative controls or PPE, the SWMS must also describe the other controls that were considered. Most templates also add business and site details, PPE, plant, licences, emergency arrangements and a worker sign-on. The template above includes all of these.
How to fill in a SWMS, step by step
-
Step 1
Add the business and job details
Business name, ABN, site address, principal contractor, the supervisor responsible, and a clear description of the work.
-
Step 2
Tick the high risk construction work
Go through the 18 categories and tick every one the job involves. If none apply, the law doesn't require a SWMS, though the builder may still ask for one.
-
Step 3
Break the job into steps
List the work in the order it happens, from setting up to packing down. Five to ten steps is typical.
-
Step 4
List the hazards for each step
Be specific to this site: '2.4 m fall from the unprotected edge on the north side' is better than 'falls'.
-
Step 5
Write the controls, best first
Follow the hierarchy of controls: eliminate the hazard, then substitute, isolate or use engineering controls, then administrative controls, and PPE last. Rate the risk before and after.
-
Step 6
Consult the crew, sign it and keep it on site
Talk it through with the workers who'll do the job, get everyone to sign on, give a copy to the principal contractor, and keep it where workers can read it.
Risk rating key
| Rating | What it means |
|---|---|
| High | Could kill or seriously injure someone, or is likely to happen. Stop and control it before work starts. |
| Medium | Could cause an injury that needs medical treatment. Control it and keep checking. |
| Low | Could cause a minor injury or first aid. Manage with normal site practice. |
SWMS example: working at heights
A completed SWMS for work at more than 2 metres. Every trade template on this page is filled in to the same level.
- Work activity
- Work at height of more than 2 metres on a building, using edge protection, scaffold, elevating work platforms (EWPs), ladders and fall-arrest equipment.
- High risk construction work
-
- Risk of a fall of more than 2 metres
- PPE
- Hard hat, Hi-vis clothing, Steel-cap boots, Work gloves, Fall-arrest harness, Sun protection (hat, long sleeves, SPF 50+)
- Plant and equipment
- Mobile scaffold or fixed scaffold
- Scissor lift or boom lift (EWP)
- Industrial ladders (AS/NZS 1892)
- Harness, lanyard, shock absorber and rated anchor points
- Tool lanyards, barricades and signs
- Licences and training
- General construction induction (White Card)
- Working at heights training
- EWP operator training for the unit used; WP high risk work licence for booms of 11 m or more
- Scaffolding licence (SB/SI/SA) for scaffold over 4 m
- Rescue training for anyone using a harness
| # | Job step | Hazards | Risk | Control measures | Residual | Responsible |
|---|---|---|---|---|---|---|
| 1 | Plan the job and check the site |
| High |
| Medium | Supervisor |
| 2 | Choose the access and fall protection |
| High |
| Medium | Supervisor |
| 3 | Set up the scaffold, EWP or ladder |
| High |
| Low | Operator / scaffolder |
| 4 | Fit and check the harness system |
| High |
| Medium | Supervisor / worker |
| 5 | Do the work at height |
| High |
| Low | All workers |
| 6 | Lift materials up and down |
| Medium |
| Low | All workers |
| 7 | Pack down and leave the site safe |
| Medium |
| Low | Supervisor |
SWMS templates by trade
Each one is a complete, filled-in SWMS you can download as is or edit in the builder.
- Working at heights SWMS 7 job steps
- Electrical SWMS 8 job steps
- Carpentry SWMS 7 job steps
- Plumbing SWMS 7 job steps
- Air conditioning SWMS 8 job steps
- Solar installation SWMS 7 job steps
- Roofing SWMS 7 job steps
- Scaffolding SWMS 7 job steps
- Concreting SWMS 6 job steps
- Excavation SWMS 7 job steps
- Demolition SWMS 7 job steps
- Painting SWMS 7 job steps
- Tiling SWMS 6 job steps
- Landscaping SWMS 7 job steps
- Builders clean SWMS 7 job steps
- Pest control SWMS 7 job steps
SWMS rules by state and territory
Every state requires a SWMS before high risk construction work. All except Victoria use the national model WHS laws, so the rules are the same; Victoria's OHS laws require the same document under a different Act.
| State | Law | Regulator | Template |
|---|---|---|---|
| New South Wales | Work Health and Safety Regulation (NSW) | SafeWork NSW | SWMS template NSW |
| Queensland | Work Health and Safety Regulation 2011 (Qld) | Workplace Health and Safety Queensland | SWMS template QLD |
| Victoria | Occupational Health and Safety Regulations 2017 (Vic) | WorkSafe Victoria | SWMS template VIC |
| Western Australia | Work Health and Safety (General) Regulations 2022 (WA) | WorkSafe WA | SWMS template WA |
| South Australia | Work Health and Safety Regulations 2012 (SA) | SafeWork SA | SWMS template SA |
| Tasmania | Work Health and Safety Act 2012 (Tas) | WorkSafe Tasmania | Use the template above |
| Australian Capital Territory | Work Health and Safety Act 2011 (ACT) | WorkSafe ACT | Use the template above |
| Northern Territory | Work Health and Safety (National Uniform Legislation) Act 2011 (NT) | NT WorkSafe | Use the template above |
SWMS vs JSA vs risk assessment
A JSA (job safety analysis) looks a lot like a SWMS, but only a SWMS is required by law, and only for high risk construction work. If the job is high risk construction work, a JSA alone isn't enough.
| Compare | SWMS | JSA | Risk assessment |
|---|---|---|---|
| What it's for | High risk construction work | Any task, high risk or not | Any hazard at the workplace |
| Required by law | Yes, before high risk construction work | No, it's a common way to manage risk | The process is required; a set form isn't |
| Format | Job steps, hazards, controls, review and sign-on | Job steps, hazards, controls | Hazards, likelihood, consequence, controls |
| Who signs | Every worker doing the work, before starting | Usually the crew at pre-start | Whoever completes it |
Keeping, reviewing and sharing your SWMS
Follow it, or stop
If the work isn't being done the way the SWMS says, stop it as soon as it's safe, and restart only in line with the SWMS (reg 300).
Review it when controls change
Review and, if needed, revise the SWMS whenever the control measures change (reg 302). In practice: a new site, new equipment, an incident, or a worker's concern.
Give the builder a copy
Before the work starts, give a copy to the principal contractor. They must take reasonable steps to get one (reg 312).
Keep it where workers can read it
The SWMS must be readily accessible to the workers doing the job and available to an inspector (reg 303).
Keep it until the work is finished
If a notifiable incident happens during the work, keep it for at least 2 years after the incident (reg 303).
Write it with the crew
Consult the workers who'll do the job. They know where it goes wrong, and they're the ones signing it.
Regulation numbers are from the model WHS Regulations (the same numbers are used in NSW, QLD, WA, SA, TAS, ACT and NT). Victoria's are different.
SWMS questions
What is a SWMS template?
Is there a free SWMS template?
How do I make my own SWMS?
Is a SWMS a legal requirement?
Who is responsible for preparing a SWMS?
Are there 18 or 19 high risk construction work categories?
Can one SWMS cover more than one job?
Can a SWMS be digital?
How long do you need to keep a SWMS?
Attach the SWMS to every job