Solar panel installation SWMS template

Solar installs involve a risk of falling more than 2 metres and work near energised electrical services, both high risk construction work, so a SWMS is required. This one covers the roof check, fall protection, lifting panels, racking, DC wiring, inverter and AC connection, commissioning and heat. Edit it for your job and download it.

Edit it online

Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.

The solar installation SWMS

7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.

Work activity
Installation of a rooftop solar PV system on a residential building: racking, panels, DC and AC wiring, inverter and battery, including work at height of more than 2 metres.
High risk construction work
  • Risk of a fall of more than 2 metres
  • On or near energised electrical installations
PPE
Safety glasses, Hi-vis clothing, Steel-cap boots, Work gloves, Insulated gloves (rated), Fall-arrest harness, Sun protection (hat, long sleeves, SPF 50+)
Plant and equipment
  • Roof edge protection or scaffold
  • Panel hoist or ladder lift
  • Harness and certified anchors
  • Cordless drivers and drills
  • DC-rated isolators, insulated tools
  • Multi-meter and insulation resistance tester
Licences and training
  • General construction induction (White Card)
  • Electrical licence for the state
  • Solar installer accreditation for STC-eligible systems
  • Working at heights training
Job steps, hazards, risk ratings and control measures
# Job step Hazards Risk Control measures Residual Responsible
1 Inspect the roof and plan the job
  • Fragile roofing and skylights
  • Asbestos cement roofs
  • Overhead powerlines
  • Weather
High
  • Inspect from an EWP or ladder; mark fragile areas
  • Confirm the roof material and condition; don't drill asbestos cement
  • Check powerline clearance and the service line to the house
  • Every worker reads and signs this SWMS
Medium Supervisor
2 Install fall protection and access
  • Falls from the roof edge or through the roof
High
  • Install edge protection or scaffold before roof work
  • Where that isn't possible, use fall restraint to certified anchors
  • Use a secured ladder that extends 1 m above the gutter
Low Supervisor
3 Lift panels and racking to the roof
  • Panels catching the wind
  • Dropped loads
  • Back strain
High
  • Use a panel hoist or ladder lift; don't carry panels up ladders
  • Don't lift panels in strong wind; keep the area below clear
  • Two people handle each panel on the roof
Medium All workers
4 Install racking and fix panels
  • Slips on tiles and sheeting
  • Damaged tiles creating trip points
  • Hot roof surfaces
Medium
  • Wear soft-soled boots with grip; walk on tile valleys or sheet ribs
  • Lay out materials so they can't slide off
  • Start early on hot days and keep water on the roof
Low All workers
5 Wire the DC array
  • DC electric shock and arc from energised panels
  • Connectors disconnected under load
High
  • Cover panels or work early or late when output is low
  • Leave DC isolators off; never connect or disconnect under load
  • Use insulated tools and matching connectors
  • Test polarity and open-circuit voltage before connecting to the inverter
Medium Licensed electrician
6 Install the inverter and battery and connect to the switchboard
  • Electric shock at the switchboard
  • Battery fire or chemical release
  • Heavy batteries
High
  • Isolate, lock out and test dead at the switchboard
  • Install the battery to the manufacturer's instructions and clearances
  • Use lifting aids or two people for heavy units
Low Licensed electrician
7 Test, commission and hand over
  • Shock during testing
  • Incorrect shutdown labels
Medium
  • Do insulation resistance and polarity tests before energising
  • Fit the required labels and shutdown procedure
  • Give the customer the compliance certificate and explain the shutdown steps
Low Licensed electrician

Rules that apply to solar installation work

  • Solar panels produce DC voltage whenever light hits them. You can't switch them off: cover panels and don't connect or disconnect connectors under load.
  • Electrical work on the system must be done by a licensed electrician, and accreditation is needed for the system to be eligible for small-scale technology certificates (STCs).
  • Install roof edge protection or other fall protection before work starts, and treat skylights and old roofing as fragile.
  • Don't install on asbestos cement roofs without a specific assessment; drilling them releases fibres.

Questions

Do solar installers need a SWMS?
Yes, for nearly every rooftop install. Work with a risk of falling more than 2 metres, and work on or near energised electrical installations, are both high risk construction work.
Why can't you turn solar panels off?
Panels generate DC voltage whenever light reaches them. Isolators stop current flowing to the inverter, but the panels and the cables to the isolator stay live. Cover panels or work in low light, and never break connectors under load.
Who can install solar panels in Australia?
The electrical work must be done by a licensed electrician. For the system to earn small-scale technology certificates (the federal rebate), the installer and designer also need the required solar accreditation.
Is this solar installation SWMS free to use?
Yes. Download it as Word or PDF with no sign-up, or open it in the online builder to change the steps and add your business details first. Check it against your own job and site before you use it.