Free template · Australia · Updated November 2026
Solar panel installation SWMS template
Solar installs involve a risk of falling more than 2 metres and work near energised electrical services, both high risk construction work, so a SWMS is required. This one covers the roof check, fall protection, lifting panels, racking, DC wiring, inverter and AC connection, commissioning and heat. Edit it for your job and download it.
Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.
The solar installation SWMS
7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.
- Work activity
- Installation of a rooftop solar PV system on a residential building: racking, panels, DC and AC wiring, inverter and battery, including work at height of more than 2 metres.
- High risk construction work
-
- Risk of a fall of more than 2 metres
- On or near energised electrical installations
- PPE
- Safety glasses, Hi-vis clothing, Steel-cap boots, Work gloves, Insulated gloves (rated), Fall-arrest harness, Sun protection (hat, long sleeves, SPF 50+)
- Plant and equipment
- Roof edge protection or scaffold
- Panel hoist or ladder lift
- Harness and certified anchors
- Cordless drivers and drills
- DC-rated isolators, insulated tools
- Multi-meter and insulation resistance tester
- Licences and training
- General construction induction (White Card)
- Electrical licence for the state
- Solar installer accreditation for STC-eligible systems
- Working at heights training
| # | Job step | Hazards | Risk | Control measures | Residual | Responsible |
|---|---|---|---|---|---|---|
| 1 | Inspect the roof and plan the job |
| High |
| Medium | Supervisor |
| 2 | Install fall protection and access |
| High |
| Low | Supervisor |
| 3 | Lift panels and racking to the roof |
| High |
| Medium | All workers |
| 4 | Install racking and fix panels |
| Medium |
| Low | All workers |
| 5 | Wire the DC array |
| High |
| Medium | Licensed electrician |
| 6 | Install the inverter and battery and connect to the switchboard |
| High |
| Low | Licensed electrician |
| 7 | Test, commission and hand over |
| Medium |
| Low | Licensed electrician |
Rules that apply to solar installation work
- Solar panels produce DC voltage whenever light hits them. You can't switch them off: cover panels and don't connect or disconnect connectors under load.
- Electrical work on the system must be done by a licensed electrician, and accreditation is needed for the system to be eligible for small-scale technology certificates (STCs).
- Install roof edge protection or other fall protection before work starts, and treat skylights and old roofing as fragile.
- Don't install on asbestos cement roofs without a specific assessment; drilling them releases fibres.
Questions
Do solar installers need a SWMS?
Why can't you turn solar panels off?
Who can install solar panels in Australia?
Is this solar installation SWMS free to use?
More SWMS templates
- Working at heights
- Electrical
- Carpentry
- Plumbing
- Air conditioning
- Roofing
- Scaffolding
- Concreting
- Excavation
- Demolition
- Painting
- Tiling
- Landscaping
- Builders clean
- Pest control
By state: SWMS template NSW · SWMS template QLD · SWMS template VIC · SWMS template WA · SWMS template SA · Blank SWMS template
Attach the SWMS to every job
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.
Book a meeting