In Queensland, section 299 of the Work Health and Safety Regulation 2011 requires a SWMS before high risk construction work starts. The SWMS must identify the work, state the hazards and risks, describe the control measures, and describe how they will be implemented, monitored and reviewed. Use the free builder below.

Fill in your QLD SWMS

Start blank or from a trade example, then download Word or PDF. Free, no sign-up.

Free, no sign-up. Your draft saves in this browser as you type.

1. Business and job details
2. High risk construction work

Tick every category the job involves. If none apply, a SWMS isn't legally required, but many builders still ask for one.

3. PPE, plant, licences and emergency
4. Job steps, hazards and controls

One row per step, in the order the work is done. Put each hazard and each control on its own line.

    5. Monitoring and review

    The download adds a worker sign-on table and an approval block for the principal contractor.

    SWMS law in Queensland

    Act
    Work Health and Safety Act 2011 (Qld)
    Regulation
    Work Health and Safety Regulation 2011 (Qld)
    Regulator
    Workplace Health and Safety Queensland

    What to know in QLD

    • The maximum penalty for not preparing a SWMS (s299) is 60 penalty units, and the same for not stopping work that doesn't follow it (s300).
    • If a fall of more than 2 metres is controlled only by administrative controls or PPE, the SWMS must describe all the controls that were considered (s299).
    • The SWMS must be reviewed and, if needed, revised whenever the relevant control measures are revised (s302).
    • Keep it until the work is finished, or at least 2 years after a notifiable incident (s303).

    Work that needs a SWMS in QLD

    Queensland uses the national list of 18 types of high risk construction work. A SWMS is required before any of them starts.

    1. 1 Risk of a fall of more than 2 metres
    2. 2 Work on a telecommunication tower
    3. 3 Demolition of load-bearing or structural elements
    4. 4 Disturbing asbestos
    5. 5 Structural alterations needing temporary support
    6. 6 In or near a confined space
    7. 7 Shaft or trench deeper than 1.5 m, or a tunnel
    8. 8 Use of explosives
    9. 9 On or near pressurised gas mains or piping
    10. 10 On or near chemical, fuel or refrigerant lines
    11. 11 On or near energised electrical installations
    12. 12 Contaminated or flammable atmosphere
    13. 13 Tilt-up or precast concrete
    14. 14 On or next to a road, railway or shipping lane in use
    15. 15 Where powered mobile plant is moving
    16. 16 Artificial extremes of temperature
    17. 17 In or near water with a risk of drowning
    18. 18 Diving work

    What a SWMS must include, how to fill it in, and a worked example: the full SWMS guide.

    SWMS questions for QLD

    What is the penalty for not having a SWMS in Queensland?
    Up to 60 penalty units for failing to prepare a SWMS before high risk construction work (s299 of the WHS Regulation 2011), and up to 60 penalty units for not stopping work that isn't being done in line with the SWMS (s300).
    Does the principal contractor need my SWMS in Queensland?
    Yes. On a construction project, the principal contractor must take all reasonable steps to get a copy of your SWMS before the high risk construction work starts (s312).
    Do I need a new SWMS for every job in Queensland?
    Not necessarily. A SWMS can cover the same type of work across several jobs, but it must reflect each workplace's circumstances. Review it for each new site and update it if the hazards or controls are different.

    Attach the SWMS to every job

    Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.

    Book a meeting