Free template · Australia · Updated November 2026
Electrical SWMS template
Work on or near energised electrical installations is high risk construction work, so electricians need a SWMS before they start. This one covers planning, isolation and lock-out, proving dead, ceiling spaces, cabling, switchboard work, and testing and commissioning. Edit the steps for your job, add your details, then download it.
Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.
The electrical SWMS
8 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.
- Work activity
- Installation, alteration and maintenance of low-voltage wiring, switchboards, lighting and power outlets in an existing building, including work in ceiling spaces.
- High risk construction work
-
- On or near energised electrical installations
- PPE
- Safety glasses, Steel-cap boots, Work gloves, Insulated gloves (rated), P2 respirator, Knee pads, Arc-rated clothing
- Plant and equipment
- Personal danger locks, tags and lock-out devices
- Voltage tester and proving unit (CAT III/IV)
- Insulation resistance and loop impedance tester
- Insulated hand tools
- Platform ladder, crawl boards, torch
- Tested and tagged power tools and leads with RCD
- Licences and training
- General construction induction (White Card)
- Electrical licence for the state the work is in
- Low-voltage rescue and CPR (current)
- Asbestos awareness for work in older buildings
| # | Job step | Hazards | Risk | Control measures | Residual | Responsible |
|---|---|---|---|---|---|---|
| 1 | Plan the job and check the site |
| Medium |
| Low | Supervisor |
| 2 | Isolate and lock out the circuit |
| High |
| Low | Licensed electrician |
| 3 | Test before you touch |
| High |
| Low | Licensed electrician |
| 4 | Work in ceiling spaces and under floors |
| High |
| Medium | All workers |
| 5 | Run cables, drill and chase walls |
| Medium |
| Low | All workers |
| 6 | Terminate and work on switchboards |
| High |
| Medium | Licensed electrician |
| 7 | Test, commission and re-energise |
| High |
| Low | Licensed electrician |
| 8 | Clean up and hand over |
| Low |
| Low | Licensed electrician |
Rules that apply to electrical work
- Don't work live. The WHS Regulations only allow energised work in narrow cases (such as testing and fault finding), with a risk assessment and a safety observer.
- Follow AS/NZS 4836 (safe working on or near low-voltage electrical installations) and AS/NZS 3000 (the Wiring Rules).
- Test before you touch: prove the tester on a known source, test the circuit, then prove the tester again.
- Portable tools and leads on construction sites are tested and tagged, and protected by an RCD (AS/NZS 3012).
- In buildings built before 1990, check the asbestos register: older switchboard backing panels and some cable ducts contain asbestos.
Questions
Do electricians need a SWMS?
Can an electrician work live?
What standard covers safe electrical work in Australia?
Is this electrical SWMS free to use?
More SWMS templates
- Working at heights
- Carpentry
- Plumbing
- Air conditioning
- Solar installation
- Roofing
- Scaffolding
- Concreting
- Excavation
- Demolition
- Painting
- Tiling
- Landscaping
- Builders clean
- Pest control
By state: SWMS template NSW · SWMS template QLD · SWMS template VIC · SWMS template WA · SWMS template SA · Blank SWMS template
Attach the SWMS to every job
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.
Book a meeting