Free template · Victoria · Updated November 2026
SWMS template for Victoria
Victoria hasn't adopted the national WHS laws, but it still requires a SWMS before high risk construction work starts, under the Occupational Health and Safety Regulations 2017. The SWMS covers the same ground: the high risk work, hazards and risks, control measures, and how they're put in place and reviewed. Use the free builder below.
Fill in your VIC SWMS
Start blank or from a trade example, then download Word or PDF. Free, no sign-up.
Free, no sign-up. Your draft saves in this browser as you type.
Your SWMS is downloading.
Next time, keep it on the job. In Fieldmox the SWMS sits on the job with the quote, schedule and photos, so whoever is on site can find it, and you're not digging through email when the builder asks for it.
Book a meetingStep 1
SWMS law in Victoria
- Act
- Occupational Health and Safety Act 2004 (Vic)
- Regulation
- Occupational Health and Safety Regulations 2017 (Vic)
- Regulator
- WorkSafe Victoria
- Regulator's own template
- WorkSafe Victoria SWMS template
What to know in VIC
- Victoria's law talks about employers and self-employed persons rather than a PCBU, but the duty to prepare a SWMS before high risk construction work is the same idea.
- WorkSafe Victoria counts 19 high risk construction work activities. The work covered is essentially the same as the 18 national categories; Victoria lists shafts or trenches and tunnels separately.
- WorkSafe Victoria publishes its own SWMS template (PDF) with guidance on what to include.
Work that needs a SWMS in VIC
WorkSafe Victoria counts 19 high risk construction work activities. They cover the same work as the 18 national categories below, with shafts or trenches and tunnels listed separately.
- 1 Risk of a fall of more than 2 metres
- 2 Work on a telecommunication tower
- 3 Demolition of load-bearing or structural elements
- 4 Disturbing asbestos
- 5 Structural alterations needing temporary support
- 6 In or near a confined space
- 7 Shaft or trench deeper than 1.5 m, or a tunnel
- 8 Use of explosives
- 9 On or near pressurised gas mains or piping
- 10 On or near chemical, fuel or refrigerant lines
- 11 On or near energised electrical installations
- 12 Contaminated or flammable atmosphere
- 13 Tilt-up or precast concrete
- 14 On or next to a road, railway or shipping lane in use
- 15 Where powered mobile plant is moving
- 16 Artificial extremes of temperature
- 17 In or near water with a risk of drowning
- 18 Diving work
What a SWMS must include, how to fill it in, and a worked example: the full SWMS guide.
SWMS templates by trade
- Working at heights
- Electrical
- Carpentry
- Plumbing
- Air conditioning
- Solar installation
- Roofing
- Scaffolding
- Concreting
- Excavation
- Demolition
- Painting
- Tiling
- Landscaping
- Builders clean
- Pest control
Other states: SWMS template NSW · SWMS template QLD · SWMS template WA · SWMS template SA
SWMS questions for VIC
Is a SWMS required in Victoria?
Is a Victorian SWMS different from a NSW one?
Does WorkSafe Victoria have a free SWMS template?
Attach the SWMS to every job
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.
Book a meeting