SWMS template for Victoria

Victoria hasn't adopted the national WHS laws, but it still requires a SWMS before high risk construction work starts, under the Occupational Health and Safety Regulations 2017. The SWMS covers the same ground: the high risk work, hazards and risks, control measures, and how they're put in place and reviewed. Use the free builder below.

Fill in your VIC SWMS

Start blank or from a trade example, then download Word or PDF. Free, no sign-up.

Free, no sign-up. Your draft saves in this browser as you type.

1. Business and job details
2. High risk construction work

Tick every category the job involves. If none apply, a SWMS isn't legally required, but many builders still ask for one.

3. PPE, plant, licences and emergency
4. Job steps, hazards and controls

One row per step, in the order the work is done. Put each hazard and each control on its own line.

    5. Monitoring and review

    The download adds a worker sign-on table and an approval block for the principal contractor.

    SWMS law in Victoria

    Act
    Occupational Health and Safety Act 2004 (Vic)
    Regulation
    Occupational Health and Safety Regulations 2017 (Vic)
    Regulator
    WorkSafe Victoria
    Regulator's own template
    WorkSafe Victoria SWMS template

    What to know in VIC

    • Victoria's law talks about employers and self-employed persons rather than a PCBU, but the duty to prepare a SWMS before high risk construction work is the same idea.
    • WorkSafe Victoria counts 19 high risk construction work activities. The work covered is essentially the same as the 18 national categories; Victoria lists shafts or trenches and tunnels separately.
    • WorkSafe Victoria publishes its own SWMS template (PDF) with guidance on what to include.

    Work that needs a SWMS in VIC

    WorkSafe Victoria counts 19 high risk construction work activities. They cover the same work as the 18 national categories below, with shafts or trenches and tunnels listed separately.

    1. 1 Risk of a fall of more than 2 metres
    2. 2 Work on a telecommunication tower
    3. 3 Demolition of load-bearing or structural elements
    4. 4 Disturbing asbestos
    5. 5 Structural alterations needing temporary support
    6. 6 In or near a confined space
    7. 7 Shaft or trench deeper than 1.5 m, or a tunnel
    8. 8 Use of explosives
    9. 9 On or near pressurised gas mains or piping
    10. 10 On or near chemical, fuel or refrigerant lines
    11. 11 On or near energised electrical installations
    12. 12 Contaminated or flammable atmosphere
    13. 13 Tilt-up or precast concrete
    14. 14 On or next to a road, railway or shipping lane in use
    15. 15 Where powered mobile plant is moving
    16. 16 Artificial extremes of temperature
    17. 17 In or near water with a risk of drowning
    18. 18 Diving work

    What a SWMS must include, how to fill it in, and a worked example: the full SWMS guide.

    SWMS questions for VIC

    Is a SWMS required in Victoria?
    Yes. Under the OHS Regulations 2017, a SWMS must be prepared before high risk construction work starts, and the work must be done in line with it.
    Is a Victorian SWMS different from a NSW one?
    The content is very similar: the high risk work, hazards, controls, and how they're monitored and reviewed. The difference is the law it sits under (the OHS Act 2004 and OHS Regulations 2017 rather than the WHS Act) and some wording. Check WorkSafe Victoria's guidance for the details.
    Does WorkSafe Victoria have a free SWMS template?
    Yes, a PDF template with guidance. The builder on this page covers the same sections, can be edited online, and downloads as Word or PDF.

    Attach the SWMS to every job

    Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.

    Book a meeting