Free template · Australia · Updated November 2026
Landscaping SWMS template
Landscaping needs a SWMS when it includes high risk construction work, most often working where a bobcat or mini excavator is moving, or digging a trench deeper than 1.5 metres. This one covers finding services, machinery, retaining walls, cutting pavers, chemicals, power tools and heat. Edit it and download it.
Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.
The landscaping SWMS
7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.
- Work activity
- Landscape construction at a residential site: excavation with a mini loader and excavator, retaining walls, paving, turf, garden beds and irrigation.
- High risk construction work
-
- Where powered mobile plant is moving
- PPE
- Safety glasses, Hearing protection, Hi-vis clothing, Steel-cap boots, Work gloves, P2 respirator, Sun protection (hat, long sleeves, SPF 50+)
- Plant and equipment
- Mini loader (skid steer) and mini excavator
- Plate compactor
- Paver saw (wet cut) or grinder with extraction
- Brushcutter, hedge trimmer, chainsaw
- Wheelbarrows and trolleys
- Licences and training
- General construction induction (White Card)
- Plant operator competency for loaders and excavators
- Chemical user training (for herbicides) where the state requires it
| # | Job step | Hazards | Risk | Control measures | Residual | Responsible |
|---|---|---|---|---|---|---|
| 1 | Locate services and set up |
| High |
| Medium | Supervisor |
| 2 | Operate the loader and excavator |
| High |
| Medium | Operator |
| 3 | Build retaining walls and dig footings |
| High |
| Medium | Supervisor |
| 4 | Cut pavers, blocks and stone |
| High |
| Low | All workers |
| 5 | Use power tools in gardens |
| Medium |
| Low | All workers |
| 6 | Apply herbicides and fertilisers |
| Medium |
| Low | All workers |
| 7 | Work in heat and sun |
| Medium |
| Low | Supervisor |
Rules that apply to landscaping work
- Get Before You Dig Australia plans before digging. Irrigation and garden lighting are often near shallow electrical cables.
- Cutting pavers, blocks and stone releases crystalline silica. Cut wet or with extraction and wear a P2 respirator.
- Retaining walls over the height your council allows, or that support a load, need engineering.
- Plant operators wear seatbelts, and nobody enters the machine's swing or travel path.
Questions
Do landscapers need a SWMS?
Do I need a licence to drive a bobcat?
How do I cut pavers safely?
Is this landscaping SWMS free to use?
More SWMS templates
- Working at heights
- Electrical
- Carpentry
- Plumbing
- Air conditioning
- Solar installation
- Roofing
- Scaffolding
- Concreting
- Excavation
- Demolition
- Painting
- Tiling
- Builders clean
- Pest control
By state: SWMS template NSW · SWMS template QLD · SWMS template VIC · SWMS template WA · SWMS template SA · Blank SWMS template
Attach the SWMS to every job
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.
Book a meeting