Fieldmox by Heffl

Free template · Australia · Updated November 2026

Roofing SWMS template

Roof work almost always involves a risk of falling more than 2 metres, so it is high risk construction work and needs a SWMS. This one covers checking the roof, edge protection, access, lifting sheets, laying and fixing, cutting, and heat. Change it for your job and download it.

Edit it online

Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.

The roofing SWMS

7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.

Work activity
Removing and replacing metal roof sheeting, gutters and flashings on a single- or two-storey building, including work at height of more than 2 metres.
High risk construction work
  • Risk of a fall of more than 2 metres
PPE
Safety glasses, Hearing protection, Hi-vis clothing, Steel-cap boots, Cut-resistant gloves, Fall-arrest harness, Sun protection (hat, long sleeves, SPF 50+)
Plant and equipment
  • Roof edge protection and scaffold
  • Safety mesh
  • Materials hoist or crane for sheets
  • Nibbler, shears, drop saw, screw guns
  • Harness, lanyard and certified anchors
  • Tested and tagged tools with RCD
Licences and training
  • General construction induction (White Card)
  • Roofing licence where the state requires one
  • Working at heights training
  • Dogging licence (DG) if slinging crane loads
Job steps, hazards, risk ratings and control measures
# Job step Hazards Risk Control measures Residual Responsible
1 Inspect the roof and plan the job
  • Fragile roofing, skylights and box gutters
  • Asbestos cement sheeting
  • Overhead powerlines
  • Wind, rain and heat
High
  • Inspect from a ladder or EWP first; mark skylights and fragile areas
  • Confirm whether old sheeting is asbestos before disturbing it
  • Check powerline clearance; arrange isolation or shrouding if needed
  • Check the forecast; don't lay sheets in strong wind or on wet roofs
  • Every worker reads and signs this SWMS
Medium Supervisor
2 Install edge protection and access
  • Falls from the roof edge
  • Falls while climbing on and off
High
  • Install roof edge protection or perimeter scaffold before anyone works on the roof
  • Use a scaffold stair or secured ladder that extends 1 m above the landing
  • Cover or guard skylights and penetrations
Low Supervisor
3 Lift roofing materials
  • Sheets catching the wind
  • Dropped loads
  • Manual handling strain
High
  • Lift sheets by hoist or crane, not by hand up ladders
  • Use tag lines and keep the drop zone clear
  • Strap down stacks on the roof
Medium All workers
4 Remove old sheeting and lay new sheets
  • Falling through openings as sheets are removed
  • Cuts from sheet edges
  • Slips on dew or dust
High
  • Remove sheets in sections and install safety mesh before laying new sheets
  • Work from laid sheets or crawl boards, never from purlins alone
  • Wear cut-resistant gloves and long sleeves
  • Start once the roof is dry
Medium All workers
5 Cut and fix sheeting and flashings
  • Hot swarf and sparks
  • Noise
  • Eye injuries
Medium
  • Use nibblers or shears instead of abrasive cutters where possible
  • Wear safety glasses and hearing protection
  • Sweep swarf off the roof straight away to stop rust and slips
Low All workers
6 Work in heat and sun
  • Heat stress
  • Sunburn
  • Burns from hot sheeting
Medium
  • Start early and plan the hottest work for the coolest part of the day
  • Drink water often; take breaks in shade
  • Wear sun protection and gloves
Low Supervisor
7 Clean up and dismantle
  • Falls while removing edge protection
  • Off-cuts falling to ground
Medium
  • Remove edge protection last, in reverse order
  • Lower off-cuts in bins, never throw them down
Low Supervisor

Rules that apply to roofing work

  • Treat every roof as fragile until proven otherwise: skylights, old fibre cement and rusted sheeting won't hold a person.
  • Install roof edge protection (AS/NZS 4994) or scaffold before work starts. Use safety mesh (AS/NZS 4389) under new metal roofing.
  • Asbestos cement roofs must not be walked on without crawl boards and fall protection, and must not be pressure washed or cut with power tools.
  • Fall-arrest anchors must be installed and certified for the purpose (AS/NZS 5532).

Questions

Do roofers need a SWMS?
Almost always. Roof work usually has a risk of falling more than 2 metres, which makes it high risk construction work. Some states also have specific rules for roof work on housing, so check your regulator's code of practice on falls.
Can you walk on an asbestos cement roof?
Not directly. Asbestos cement sheeting is brittle and can give way. Use crawl boards that span the purlins, plus fall protection under or around the work. Don't pressure wash, sand or cut it with power tools.
Is safety mesh required under a new metal roof?
Safety mesh to AS/NZS 4389 is the usual control for falls through a roof during installation, and many codes of practice expect it for new metal roofs. It must be installed correctly and tensioned before sheets go on.
Is this roofing SWMS free to use?
Yes. Download it as Word or PDF with no sign-up, or open it in the online builder to change the steps and add your business details first. Check it against your own job and site before you use it.

Attach the SWMS to every job

Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.

Book a meeting