Fieldmox by Heffl

Free template · Australia · Updated November 2026

Free SWMS template

A SWMS (Safe Work Method Statement) is the document Australian law requires before any high risk construction work starts. It lists the high risk work involved, the hazards at each step, the controls that deal with them, and how those controls are checked. Fill in the template below and download it as Word or PDF. It's free, with no sign-up.

  • No sign-up or email
  • Word and PDF
  • All 18 high risk work categories
  • 16 trade examples
Fill it in online

Fill in your SWMS

Start blank or from a trade example, change anything, and download. Everything stays in your browser.

Free, no sign-up. Your draft saves in this browser as you type.

1. Business and job details
2. High risk construction work

Tick every category the job involves. If none apply, a SWMS isn't legally required, but many builders still ask for one.

3. PPE, plant, licences and emergency
4. Job steps, hazards and controls

One row per step, in the order the work is done. Put each hazard and each control on its own line.

    5. Monitoring and review

    The download adds a worker sign-on table and an approval block for the principal contractor.

    The template and examples are a starting point. Check every step against your own job and site, talk it through with your crew, and follow your state's regulator if anything here differs.

    What is a SWMS?

    A Safe Work Method Statement (SWMS, said "swims") is a written plan for doing high risk construction work safely. It sets out the work step by step, the hazards in each step, and the controls the crew will use. Everyone doing the work reads and signs it before starting.

    It isn't a general safety policy or a full risk assessment. It's a working document for supervisors and workers on site, so it should be short, specific to the job, and written in plain language the crew understands.

    When do you need a SWMS? The 18 types of high risk construction work

    You need a SWMS before construction work starts if it involves any of these. The list is regulation 291 of the model WHS Regulations, used in every state and territory except Victoria, which has its own near-identical list.

    1. 1 Work that involves a risk of a person falling more than 2 metres
    2. 2 Work that is carried out on a telecommunication tower
    3. 3 Work that involves demolition of an element of a structure that is load-bearing or otherwise related to the physical integrity of the structure
    4. 4 Work that involves, or is likely to involve, the disturbance of asbestos
    5. 5 Work that involves structural alterations or repairs that require temporary support to prevent collapse
    6. 6 Work that is carried out in or near a confined space
    7. 7 Work that is carried out in or near a shaft or trench with an excavated depth greater than 1.5 metres, or a tunnel
    8. 8 Work that involves the use of explosives
    9. 9 Work that is carried out on or near pressurised gas distribution mains or piping
    10. 10 Work that is carried out on or near chemical, fuel or refrigerant lines
    11. 11 Work that is carried out on or near energised electrical installations or services
    12. 12 Work that is carried out in an area that may have a contaminated or flammable atmosphere
    13. 13 Work that involves tilt-up or precast concrete
    14. 14 Work that is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians
    15. 15 Work that is carried out in an area at a workplace in which there is any movement of powered mobile plant
    16. 16 Work that is carried out in an area in which there are artificial extremes of temperature
    17. 17 Work that is carried out in or near water or other liquid that involves a risk of drowning
    18. 18 Work that involves diving work

    If none of these apply, the law doesn't require a SWMS. You still have to manage the risks, and many builders and facility managers ask every contractor for one, so it's worth having.

    What a SWMS must include

    Under regulation 299, a SWMS must do four things, take account of the conditions at the workplace, and be set out so the people using it can understand it.

    1. 1

      Identify the high risk construction work

      Name which of the 18 categories the job involves.

    2. 2

      State the hazards and risks

      For each step of the work, what could hurt someone.

    3. 3

      Describe the control measures

      What the crew will do to eliminate or reduce each risk, most effective first.

    4. 4

      Describe how the controls are implemented, monitored and reviewed

      Who checks them, when, and what triggers a review.

    If a fall of more than 2 metres is controlled only with administrative controls or PPE, the SWMS must also describe the other controls that were considered. Most templates also add business and site details, PPE, plant, licences, emergency arrangements and a worker sign-on. The template above includes all of these.

    How to fill in a SWMS, step by step

    1. Step 1

      Add the business and job details

      Business name, ABN, site address, principal contractor, the supervisor responsible, and a clear description of the work.

    2. Step 2

      Tick the high risk construction work

      Go through the 18 categories and tick every one the job involves. If none apply, the law doesn't require a SWMS, though the builder may still ask for one.

    3. Step 3

      Break the job into steps

      List the work in the order it happens, from setting up to packing down. Five to ten steps is typical.

    4. Step 4

      List the hazards for each step

      Be specific to this site: '2.4 m fall from the unprotected edge on the north side' is better than 'falls'.

    5. Step 5

      Write the controls, best first

      Follow the hierarchy of controls: eliminate the hazard, then substitute, isolate or use engineering controls, then administrative controls, and PPE last. Rate the risk before and after.

    6. Step 6

      Consult the crew, sign it and keep it on site

      Talk it through with the workers who'll do the job, get everyone to sign on, give a copy to the principal contractor, and keep it where workers can read it.

    Risk rating key

    Rating What it means
    High Could kill or seriously injure someone, or is likely to happen. Stop and control it before work starts.
    Medium Could cause an injury that needs medical treatment. Control it and keep checking.
    Low Could cause a minor injury or first aid. Manage with normal site practice.

    SWMS example: working at heights

    A completed SWMS for work at more than 2 metres. Every trade template on this page is filled in to the same level.

    Work activity
    Work at height of more than 2 metres on a building, using edge protection, scaffold, elevating work platforms (EWPs), ladders and fall-arrest equipment.
    High risk construction work
    • Risk of a fall of more than 2 metres
    PPE
    Hard hat, Hi-vis clothing, Steel-cap boots, Work gloves, Fall-arrest harness, Sun protection (hat, long sleeves, SPF 50+)
    Plant and equipment
    • Mobile scaffold or fixed scaffold
    • Scissor lift or boom lift (EWP)
    • Industrial ladders (AS/NZS 1892)
    • Harness, lanyard, shock absorber and rated anchor points
    • Tool lanyards, barricades and signs
    Licences and training
    • General construction induction (White Card)
    • Working at heights training
    • EWP operator training for the unit used; WP high risk work licence for booms of 11 m or more
    • Scaffolding licence (SB/SI/SA) for scaffold over 4 m
    • Rescue training for anyone using a harness
    Job steps, hazards, risk ratings and control measures
    # Job step Hazards Risk Control measures Residual Responsible
    1 Plan the job and check the site
    • Unprotected edges, openings and voids
    • Fragile roofs, skylights and sheeting
    • Overhead powerlines
    • Soft or uneven ground
    • Wind, rain and heat
    High
    • Walk the site before work and mark every edge, opening and fragile surface
    • Check the distance to overhead powerlines and stay outside the state's no-go zone
    • Check the weather forecast and stop work in high wind, rain or lightning
    • Write the rescue plan and brief the crew at the pre-start talk
    • Every worker reads and signs this SWMS before starting
    Medium Supervisor
    2 Choose the access and fall protection
    • Falls from height
    • Using the wrong equipment for the task
    High
    • Do the work from the ground where possible (prefabricate, use extension poles)
    • Use edge protection or scaffold before an EWP, and an EWP before a harness
    • Use fall restraint so the worker can't reach the edge before considering fall arrest
    • Ladders only for short, light work where 3 points of contact can be kept
    Medium Supervisor
    3 Set up the scaffold, EWP or ladder
    • Platform or ladder tipping over
    • Unstable or sloping ground
    • Contact with structures or powerlines
    • People walking underneath
    High
    • Check the ground is firm and level; use sole boards and outriggers as the manufacturer requires
    • Do the EWP pre-start check and fill in the logbook before use
    • Scaffold over 4 m erected by a licensed scaffolder, with a handover certificate before use
    • Secure ladders top and bottom, set at 4:1, and extend 1 m above the landing
    • Barricade and sign an exclusion zone below the work area
    Low Operator / scaffolder
    4 Fit and check the harness system
    • Equipment failure
    • Anchor point not rated
    • Swing fall or long free fall
    • Suspension trauma after a fall
    High
    • Inspect the harness, lanyard and shock absorber before every use; tag out damaged gear
    • Use only anchor points rated for fall arrest (15 kN per person) or certified anchors
    • Keep the anchor above the worker and close to the work to limit free fall and swing
    • Never work alone in a harness; the rescue gear and trained rescuer are on site
    Medium Supervisor / worker
    5 Do the work at height
    • Falling tools and materials
    • Overreaching
    • Fatigue and heat stress
    High
    • Use tool lanyards and toe boards; keep materials away from edges
    • Keep the exclusion zone below in place until the work is finished
    • Move the platform or ladder instead of overreaching
    • Take breaks, drink water and use shade; start early on hot days
    Low All workers
    6 Lift materials up and down
    • Dropped loads
    • Manual handling injuries
    • Loads catching the wind
    Medium
    • Use a materials hoist, gin wheel or crane instead of carrying loads up ladders
    • Use tag lines and keep people out from under the load
    • Team lift anything over 20 kg or awkward to hold
    Low All workers
    7 Pack down and leave the site safe
    • Falls while dismantling
    • Unsecured edges left for others
    Medium
    • Dismantle scaffold in the reverse order it was built, by the licensed scaffolder
    • Lower the EWP fully and isolate it before leaving
    • Leave edge protection or covers in place, or hand over to the next trade in writing
    Low Supervisor

    SWMS rules by state and territory

    Every state requires a SWMS before high risk construction work. All except Victoria use the national model WHS laws, so the rules are the same; Victoria's OHS laws require the same document under a different Act.

    State Law Regulator Template
    New South Wales Work Health and Safety Regulation (NSW) SafeWork NSW SWMS template NSW
    Queensland Work Health and Safety Regulation 2011 (Qld) Workplace Health and Safety Queensland SWMS template QLD
    Victoria Occupational Health and Safety Regulations 2017 (Vic) WorkSafe Victoria SWMS template VIC
    Western Australia Work Health and Safety (General) Regulations 2022 (WA) WorkSafe WA SWMS template WA
    South Australia Work Health and Safety Regulations 2012 (SA) SafeWork SA SWMS template SA
    Tasmania Work Health and Safety Act 2012 (Tas) WorkSafe Tasmania Use the template above
    Australian Capital Territory Work Health and Safety Act 2011 (ACT) WorkSafe ACT Use the template above
    Northern Territory Work Health and Safety (National Uniform Legislation) Act 2011 (NT) NT WorkSafe Use the template above

    SWMS vs JSA vs risk assessment

    A JSA (job safety analysis) looks a lot like a SWMS, but only a SWMS is required by law, and only for high risk construction work. If the job is high risk construction work, a JSA alone isn't enough.

    Compare SWMS JSA Risk assessment
    What it's for High risk construction work Any task, high risk or not Any hazard at the workplace
    Required by law Yes, before high risk construction work No, it's a common way to manage risk The process is required; a set form isn't
    Format Job steps, hazards, controls, review and sign-on Job steps, hazards, controls Hazards, likelihood, consequence, controls
    Who signs Every worker doing the work, before starting Usually the crew at pre-start Whoever completes it

    Keeping, reviewing and sharing your SWMS

    Follow it, or stop

    If the work isn't being done the way the SWMS says, stop it as soon as it's safe, and restart only in line with the SWMS (reg 300).

    Review it when controls change

    Review and, if needed, revise the SWMS whenever the control measures change (reg 302). In practice: a new site, new equipment, an incident, or a worker's concern.

    Give the builder a copy

    Before the work starts, give a copy to the principal contractor. They must take reasonable steps to get one (reg 312).

    Keep it where workers can read it

    The SWMS must be readily accessible to the workers doing the job and available to an inspector (reg 303).

    Keep it until the work is finished

    If a notifiable incident happens during the work, keep it for at least 2 years after the incident (reg 303).

    Write it with the crew

    Consult the workers who'll do the job. They know where it goes wrong, and they're the ones signing it.

    Regulation numbers are from the model WHS Regulations (the same numbers are used in NSW, QLD, WA, SA, TAS, ACT and NT). Victoria's are different.

    SWMS questions

    What is a SWMS template?
    A ready-made Safe Work Method Statement layout with the sections the law requires: the high risk construction work involved, the job steps, hazards, control measures, how the controls are monitored and reviewed, and a worker sign-on. You fill in the details for your job.
    Is there a free SWMS template?
    Yes. The builder on this page is free, needs no sign-up, and downloads as Word or PDF. SafeWork NSW and WorkSafe Victoria also publish free templates, and you can start from one of our 16 filled-in trade examples.
    How do I make my own SWMS?
    Add your business and job details, tick the high risk construction work involved, break the job into steps, list the hazards for each step, and write the control measures, most effective first. Then talk it through with your crew, get them to sign it, and give a copy to the principal contractor.
    Is a SWMS a legal requirement?
    Yes, for high risk construction work. In every state and territory, a SWMS must be prepared before high risk construction work starts, and the work must be done in line with it. In Queensland, failing to prepare one carries a maximum penalty of 60 penalty units (s299, WHS Regulation 2011).
    Who is responsible for preparing a SWMS?
    The business (PCBU) doing the high risk construction work, usually the subcontractor. It should be written with the workers who'll do the job. The principal contractor must take reasonable steps to get a copy before the work starts.
    Are there 18 or 19 high risk construction work categories?
    The model WHS Regulations (reg 291), used in every state except Victoria, list 18. Shafts or trenches deeper than 1.5 m and tunnels share one item. WorkSafe Victoria counts 19, mainly because it lists them separately. The work covered is essentially the same.
    Can one SWMS cover more than one job?
    Yes, if it covers the same type of work and still reflects each site's conditions. Review it for every new site, and update it if the hazards, the controls or the way the work is done are different.
    Can a SWMS be digital?
    Yes. The law doesn't require paper. The SWMS has to be easy for workers to get to and understand, kept until the work is finished, and available to an inspector. A PDF on a phone or tablet is fine if the crew can open it on site.
    How long do you need to keep a SWMS?
    Until the high risk construction work it covers is finished. If a notifiable incident happens during that work, keep it for at least 2 years after the incident (reg 303).

    Attach the SWMS to every job

    Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.

    Book a meeting