Free template · Australia · Updated November 2026
Tiling SWMS template
Most tiling isn't high risk construction work, so a SWMS isn't always required by law. But builders usually ask for one, and silica dust from cutting tiles is a serious risk. This one covers moving materials, removing old tiles, cutting, mixing, laying and grouting. Tick any high risk work that applies on your job, then download it.
Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.
The tiling SWMS
6 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.
- Work activity
- Removing old wall and floor tiles and installing new ceramic and porcelain tiles in a bathroom and kitchen, including cutting, waterproofing and grouting.
- High risk construction work
- None by default. Tick any that apply on your job.
- PPE
- Safety glasses, Hearing protection, Steel-cap boots, Work gloves, Chemical-resistant gloves, P2 respirator, Knee pads
- Plant and equipment
- Wet tile saw with RCD
- Angle grinder with dust extraction
- Mixing paddle and drill
- H-class vacuum
- Trolley for tile boxes and bags
- Licences and training
- General construction induction (White Card)
- Waterproofing licence where the state requires one
- Silica awareness training
| # | Job step | Hazards | Risk | Control measures | Residual | Responsible |
|---|---|---|---|---|---|---|
| 1 | Move tiles, adhesive and grout |
| Medium |
| Low | All workers |
| 2 | Remove old tiles and linings |
| High |
| Medium | Supervisor |
| 3 | Cut tiles |
| High |
| Low | All workers |
| 4 | Mix adhesive, grout and waterproofing |
| Medium |
| Low | All workers |
| 5 | Lay and grout tiles |
| Medium |
| Low | All workers |
| 6 | Clean up |
| Medium |
| Low | All workers |
Rules that apply to tiling work
- Cutting, grinding and polishing tiles, stone and grout releases crystalline silica. Cut wet or with on-tool extraction and wear a P2 respirator.
- Engineered stone is banned in Australia (from 1 July 2024 in most states). Don't cut or install it.
- Old floor tiles, adhesives and fibre cement underlay in buildings built before 1990 may contain asbestos. Test before removing.
- Wet saws must run through an RCD.
Questions
Do tilers need a SWMS?
How do tilers protect themselves from silica dust?
Can I still cut engineered stone?
Is this tiling SWMS free to use?
More SWMS templates
- Working at heights
- Electrical
- Carpentry
- Plumbing
- Air conditioning
- Solar installation
- Roofing
- Scaffolding
- Concreting
- Excavation
- Demolition
- Painting
- Landscaping
- Builders clean
- Pest control
By state: SWMS template NSW · SWMS template QLD · SWMS template VIC · SWMS template WA · SWMS template SA · Blank SWMS template
Attach the SWMS to every job
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.
Book a meeting