Excavation SWMS template
Excavation needs a SWMS when it involves a trench or shaft deeper than 1.5 metres, a tunnel, or work where powered mobile plant is moving, which covers most excavator work. This one covers locating services, setting up, digging, supporting trenches, entering and backfilling. Edit it for your site and download it.
Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.
The excavation SWMS
7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.
- Work activity
- Excavating trenches and footings with an excavator, including trenches deeper than 1.5 metres, and backfilling and compacting.
- High risk construction work
-
- Shaft or trench deeper than 1.5 m, or a tunnel
- Where powered mobile plant is moving
- PPE
- Hard hat, Safety glasses, Hearing protection, Hi-vis clothing, Steel-cap boots, Work gloves, Sun protection (hat, long sleeves, SPF 50+)
- Plant and equipment
- Excavator with quick hitch and locking pin
- Trench shields or shoring boxes
- Vacuum truck or hand tools for potholing
- Plate compactor
- Gas detector for deep trenches
- Barricades and trench covers
- Licences and training
- General construction induction (White Card)
- Excavator operator competency (VOC or equivalent)
- Traffic control training if working on a road
| # | Job step | Hazards | Risk | Control measures | Residual | Responsible |
|---|---|---|---|---|---|---|
| 1 | Locate underground services |
| High |
| Medium | Supervisor |
| 2 | Set up the site |
| High |
| Low | Supervisor |
| 3 | Operate the excavator |
| High |
| Low | Operator |
| 4 | Support trenches deeper than 1.5 metres |
| High |
| Medium | Supervisor |
| 5 | Enter and work in the trench |
| High |
| Medium | All workers |
| 6 | Backfill and compact |
| Medium |
| Low | All workers |
| 7 | Leave the site safe |
| High |
| Low | Supervisor |
Rules that apply to excavation work
- Get Before You Dig Australia plans before you dig, and expose services by hand or vacuum before using a machine near them.
- Trenches deeper than 1.5 metres must be supported (shoring, benching or battering) before anyone enters.
- Check the excavator's quick hitch locking pin is in before every lift and every dig.
- Petrol compactors and pumps in trenches can build up carbon monoxide. Use them in the open or ventilate.
Questions
When does excavation need a SWMS?
What is the 1.5 metre trench rule?
How do I find underground services before digging?
Is this excavation SWMS free to use?
More SWMS templates
- Working at heights
- Electrical
- Carpentry
- Plumbing
- Air conditioning
- Solar installation
- Roofing
- Scaffolding
- Concreting
- Demolition
- Painting
- Tiling
- Landscaping
- Builders clean
- Pest control
By state: SWMS template NSW · SWMS template QLD · SWMS template VIC · SWMS template WA · SWMS template SA · Blank SWMS template
Attach the SWMS to every job
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.
Book a meeting