Free template · South Australia · Updated November 2026

SWMS template for South Australia

In South Australia, the Work Health and Safety Regulations 2012 (SA) require a SWMS before high risk construction work starts. It must identify the work, state the hazards and risks, describe the control measures, and describe how they're implemented, monitored and reviewed. Use the free builder below, or start from a trade example.

Fill in your SA SWMS

Start blank or from a trade example, then download Word or PDF. Free, no sign-up.

Free, no sign-up. Your draft saves in this browser as you type.

1. Business and job details
2. High risk construction work

Tick every category the job involves. If none apply, a SWMS isn't legally required, but many builders still ask for one.

3. PPE, plant, licences and emergency
4. Job steps, hazards and controls

One row per step, in the order the work is done. Put each hazard and each control on its own line.

    5. Monitoring and review

    The download adds a worker sign-on table and an approval block for the principal contractor.

    SWMS law in South Australia

    Act
    Work Health and Safety Act 2012 (SA)
    Regulation
    Work Health and Safety Regulations 2012 (SA)
    Regulator
    SafeWork SA

    What to know in SA

    • South Australia follows the national model WHS laws, so the 18 high risk construction work categories and the SWMS rules match NSW, Queensland and WA.
    • The principal contractor must take reasonable steps to get a copy of your SWMS before the work starts.

    Work that needs a SWMS in SA

    South Australia uses the national list of 18 types of high risk construction work. A SWMS is required before any of them starts.

    1. 1 Risk of a fall of more than 2 metres
    2. 2 Work on a telecommunication tower
    3. 3 Demolition of load-bearing or structural elements
    4. 4 Disturbing asbestos
    5. 5 Structural alterations needing temporary support
    6. 6 In or near a confined space
    7. 7 Shaft or trench deeper than 1.5 m, or a tunnel
    8. 8 Use of explosives
    9. 9 On or near pressurised gas mains or piping
    10. 10 On or near chemical, fuel or refrigerant lines
    11. 11 On or near energised electrical installations
    12. 12 Contaminated or flammable atmosphere
    13. 13 Tilt-up or precast concrete
    14. 14 On or next to a road, railway or shipping lane in use
    15. 15 Where powered mobile plant is moving
    16. 16 Artificial extremes of temperature
    17. 17 In or near water with a risk of drowning
    18. 18 Diving work

    What a SWMS must include, how to fill it in, and a worked example: the full SWMS guide.

    SWMS questions for SA

    Is a SWMS required in South Australia?
    Yes, before any high risk construction work starts. The business doing the work must prepare it (or make sure one has been prepared), and make sure the work is done in line with it.
    Who should prepare the SWMS?
    The business doing the high risk work, in consultation with the workers who will do it. Usually the supervisor or business owner writes it and the crew reads and signs it before starting.
    How long do I keep a SWMS in SA?
    Until the high risk construction work is finished, or for at least 2 years after a notifiable incident that happened during the work.

    Attach the SWMS to every job

    Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.

    Book a meeting