Air conditioning installation SWMS template

Installing air conditioning usually involves high risk construction work: work on refrigerant lines, near energised electrical services, and often at height on roofs or walls. This one covers the site survey, lifting units, wall penetrations, ceiling spaces, brazing, electrical connection, refrigerant handling and commissioning. Edit it and download it.

Edit it online

Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.

The air conditioning SWMS

8 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.

Work activity
Installation of split system and ducted air conditioning in an existing building, including lifting units, wall penetrations, pipework, refrigerant handling and electrical connection.
High risk construction work
  • Risk of a fall of more than 2 metres
  • On or near chemical, fuel or refrigerant lines
  • On or near energised electrical installations
PPE
Safety glasses, Hearing protection, Steel-cap boots, Work gloves, Insulated gloves (rated), P2 respirator, Fall-arrest harness, Sun protection (hat, long sleeves, SPF 50+)
Plant and equipment
  • Core drill with dust extraction
  • Oxy-acetylene or air-acetylene brazing kit, dry nitrogen
  • Vacuum pump, gauges, recovery unit
  • Lifting aids, platform ladders, EWP or scaffold for high units
  • Voltage tester and lock-out kit
Licences and training
  • General construction induction (White Card)
  • ARC refrigerant handling licence
  • Electrical licence (or restricted licence) for the state
  • Working at heights training
Job steps, hazards, risk ratings and control measures
# Job step Hazards Risk Control measures Residual Responsible
1 Survey the site
  • Asbestos in older ceilings and eaves
  • Fragile roofs
  • Inadequate electrical supply
Medium
  • Check the asbestos register for buildings built before 1990
  • Plan unit locations, access and fall protection
  • Check the switchboard capacity and circuit before quoting
  • Every worker reads and signs this SWMS
Low Supervisor
2 Lift and position units
  • Back strain lifting outdoor units
  • Dropped units
  • Falls while mounting units at height
High
  • Two-person lift or lifting aid for outdoor units; crane for rooftop units
  • Use scaffold or an EWP for wall brackets above 2 m, not a ladder
  • Check bracket fixings suit the wall material
Medium All workers
3 Drill wall penetrations
  • Hidden cables and pipes
  • Silica dust from masonry
  • Drill kickback
  • Noise
Medium
  • Scan the wall before drilling
  • Use a core drill with dust extraction or water; wear a P2 respirator and hearing protection
  • Use the side handle and the clutch setting
Low All workers
4 Work in ceiling and roof spaces
  • Heat stress
  • Falling through the ceiling
  • Live cables
  • Insulation fibres
High
  • Work in the cooler part of the day and limit time in the roof space
  • Stay on joists and crawl boards
  • Isolate circuits in the area where possible; don't touch damaged cables
  • Wear a P2 respirator and long sleeves
Medium All workers
5 Braze pipework
  • Burns and fire
  • Oxygen displaced by nitrogen in small spaces
  • Gas cylinder failure
High
  • Use a heat mat; keep a fire extinguisher at hand
  • Purge with dry nitrogen at low flow and ventilate small spaces
  • Keep cylinders upright and secured, with flashback arrestors
  • Check for smouldering material after brazing
Low Licensed technician
6 Connect electrical supply
  • Electric shock
High
  • Licensed person isolates, locks out and tests before working
  • Test the installation before energising and issue the compliance certificate
Low Licensed electrician
7 Pressure test, evacuate and charge
  • Refrigerant burns (frostbite)
  • High-pressure release
  • Asphyxiation in enclosed areas
High
  • ARC licence holder handles refrigerant; wear gloves and safety glasses
  • Pressure test with nitrogen before charging; never use oxygen
  • Recover refrigerant into rated cylinders; never vent it
Low Licensed technician
8 Commission and clean up
  • Moving fan parts
  • Debris and dust left behind
Low
  • Keep covers on during test runs
  • Vacuum dust and remove packaging
  • Show the customer how to use and clean the system
Low Licensed technician

Rules that apply to air conditioning work

  • Anyone handling refrigerant needs a refrigerant handling licence from the Australian Refrigeration Council (ARC). Recover refrigerant, never vent it.
  • Electrical connection must be done by someone licensed for that work in your state.
  • Purge with dry nitrogen while brazing, and ventilate: nitrogen and refrigerant can displace oxygen in small spaces.
  • Outdoor units on roofs or walls above 2 metres need fall protection.

Questions

Do air conditioning installers need a SWMS?
Usually. Work on or near refrigerant lines and energised electrical services is high risk construction work, and so is any work with a risk of falling more than 2 metres. Most installs tick at least one of these.
What licence do I need to handle refrigerant?
A refrigerant handling licence issued by the Australian Refrigeration Council (ARC). Businesses that buy and store refrigerant also need a refrigerant trading authorisation.
Can an air conditioning installer do the electrical connection?
Only if they hold an electrical licence, or a restricted licence that covers disconnecting and reconnecting that equipment, in the state where the work is done. Otherwise a licensed electrician must connect it.
Is this air conditioning SWMS free to use?
Yes. Download it as Word or PDF with no sign-up, or open it in the online builder to change the steps and add your business details first. Check it against your own job and site before you use it.