Free template · Australia · Updated November 2026
Working at heights SWMS template
Any construction work where someone could fall more than 2 metres is high risk construction work, so it needs a SWMS before it starts. This one covers planning the access, setting up edge protection, scaffold or an EWP, harness use and rescue, falling objects and pack-down. Change the steps to match your job, add your details and download it.
Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.
The working at heights SWMS
7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.
- Work activity
- Work at height of more than 2 metres on a building, using edge protection, scaffold, elevating work platforms (EWPs), ladders and fall-arrest equipment.
- High risk construction work
-
- Risk of a fall of more than 2 metres
- PPE
- Hard hat, Hi-vis clothing, Steel-cap boots, Work gloves, Fall-arrest harness, Sun protection (hat, long sleeves, SPF 50+)
- Plant and equipment
- Mobile scaffold or fixed scaffold
- Scissor lift or boom lift (EWP)
- Industrial ladders (AS/NZS 1892)
- Harness, lanyard, shock absorber and rated anchor points
- Tool lanyards, barricades and signs
- Licences and training
- General construction induction (White Card)
- Working at heights training
- EWP operator training for the unit used; WP high risk work licence for booms of 11 m or more
- Scaffolding licence (SB/SI/SA) for scaffold over 4 m
- Rescue training for anyone using a harness
| # | Job step | Hazards | Risk | Control measures | Residual | Responsible |
|---|---|---|---|---|---|---|
| 1 | Plan the job and check the site |
| High |
| Medium | Supervisor |
| 2 | Choose the access and fall protection |
| High |
| Medium | Supervisor |
| 3 | Set up the scaffold, EWP or ladder |
| High |
| Low | Operator / scaffolder |
| 4 | Fit and check the harness system |
| High |
| Medium | Supervisor / worker |
| 5 | Do the work at height |
| High |
| Low | All workers |
| 6 | Lift materials up and down |
| Medium |
| Low | All workers |
| 7 | Pack down and leave the site safe |
| Medium |
| Low | Supervisor |
Rules that apply to working at heights work
- Use the highest control you can: work from the ground, then edge protection or scaffold, then an EWP, then fall restraint, and fall arrest last.
- Scaffold where a person or object could fall more than 4 metres must be erected, altered and dismantled by someone with a scaffolding high risk work licence.
- A boom-type EWP with a boom of 11 metres or more needs a WP high risk work licence. Smaller EWPs still need the operator to be trained on that unit.
- Fall-arrest gear is inspected before each use and by a competent person at least every 6 months (AS/NZS 1891.4).
- Have a rescue plan before anyone works in a harness. A person hanging in a harness needs to be reached within minutes.
Questions
When do you need a SWMS for working at heights?
Is a harness enough to work at heights?
Who can put up scaffold over 4 metres?
Is this working at heights SWMS free to use?
More SWMS templates
- Electrical
- Carpentry
- Plumbing
- Air conditioning
- Solar installation
- Roofing
- Scaffolding
- Concreting
- Excavation
- Demolition
- Painting
- Tiling
- Landscaping
- Builders clean
- Pest control
By state: SWMS template NSW · SWMS template QLD · SWMS template VIC · SWMS template WA · SWMS template SA · Blank SWMS template
Attach the SWMS to every job
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.
Book a meeting