Free template · Australia · Updated November 2026
Cleaning SWMS template (builders and construction cleans)
Regular office or house cleaning doesn't need a SWMS. Cleaning on a construction site often does, because the crew works where mobile plant is moving or at heights over 2 metres, which is high risk construction work. This one covers site induction, chemicals, high-level cleaning, construction dust, windows and waste. Edit it and download it.
Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.
The builders clean SWMS
7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.
- Work activity
- Builders clean of a new commercial building on an active construction site: removing construction dust, cleaning windows and glass, high-level surfaces, floors and fixtures.
- High risk construction work
-
- Risk of a fall of more than 2 metres
- Where powered mobile plant is moving
- PPE
- Hard hat, Safety glasses, Hi-vis clothing, Steel-cap boots, Cut-resistant gloves, Chemical-resistant gloves, P2 respirator
- Plant and equipment
- H-class vacuum
- Scissor lift or platform ladders
- Water-fed poles, squeegees and glass scrapers
- Floor scrubber
- Cleaning chemicals with SDS
- Wet floor signs
- Licences and training
- General construction induction (White Card)
- EWP training for the unit used
- Chemical handling training
| # | Job step | Hazards | Risk | Control measures | Residual | Responsible |
|---|---|---|---|---|---|---|
| 1 | Sign in and do the site induction |
| High |
| Medium | Supervisor |
| 2 | Bring in equipment and chemicals |
| Medium |
| Low | All workers |
| 3 | Mix and use cleaning chemicals |
| High |
| Low | All workers |
| 4 | Clean high-level surfaces |
| High |
| Medium | All workers |
| 5 | Remove construction dust |
| High |
| Low | All workers |
| 6 | Clean windows and scrape glass |
| Medium |
| Low | All workers |
| 7 | Clean floors and remove waste |
| Medium |
| Low | All workers |
Rules that apply to builders clean work
- Never mix cleaning chemicals. Bleach mixed with acids or ammonia releases toxic gas.
- Keep the safety data sheet (SDS) for every chemical on site and follow its PPE.
- Construction dust can contain crystalline silica. Vacuum with an H-class vacuum or wet wipe; don't dry sweep.
- Use an EWP or platform ladder for high-level cleaning, never furniture or buckets.
Questions
Do cleaners need a SWMS?
Which cleaning chemicals should never be mixed?
How do I clean construction dust safely?
Is this builders clean SWMS free to use?
More SWMS templates
- Working at heights
- Electrical
- Carpentry
- Plumbing
- Air conditioning
- Solar installation
- Roofing
- Scaffolding
- Concreting
- Excavation
- Demolition
- Painting
- Tiling
- Landscaping
- Pest control
By state: SWMS template NSW · SWMS template QLD · SWMS template VIC · SWMS template WA · SWMS template SA · Blank SWMS template
Attach the SWMS to every job
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.
Book a meeting