Fieldmox by Heffl

Free template · Australia · Updated November 2026

Carpentry SWMS template

Carpentry needs a SWMS when it includes high risk construction work, most often a risk of falling more than 2 metres while standing frames or fixing trusses. This one covers site setup, moving timber, cutting and nailing, standing wall frames, roof framing at height, and clean-up. Change it to suit your job and download it.

Edit it online

Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.

The carpentry SWMS

7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.

Work activity
Carpentry for a residential build: setting out, wall framing, roof framing and truss installation, and fixing out, including work at height of more than 2 metres.
High risk construction work
  • Risk of a fall of more than 2 metres
  • Where powered mobile plant is moving
PPE
Hard hat, Safety glasses, Hearing protection, Hi-vis clothing, Steel-cap boots, Work gloves, P2 respirator, Sun protection (hat, long sleeves, SPF 50+)
Plant and equipment
  • Circular saw, drop saw and nail guns
  • Tested and tagged leads with RCD
  • Industrial ladders and trestles
  • Scaffold and roof edge protection
  • Crane or telehandler for lifting trusses (if used)
Licences and training
  • General construction induction (White Card)
  • Trade qualification or supervised apprentice
  • Dogging licence (DG) for slinging crane loads
  • Working at heights training
Job steps, hazards, risk ratings and control measures
# Job step Hazards Risk Control measures Residual Responsible
1 Set up the site and work area
  • Trip hazards from off-cuts and leads
  • Other trades and moving plant
  • Members of the public
Medium
  • Sign in, do the site induction and pre-start talk; sign this SWMS
  • Keep a clear walkway and run leads overhead or along edges
  • Fence the work area off from the public
Low Supervisor
2 Unload and move timber
  • Back and shoulder strain
  • Crush injuries from falling packs
  • Splinters
Medium
  • Use a forklift, telehandler or trolley for packs; stack on level bearers
  • Team lift long or heavy lengths; wear gloves
  • Keep people clear while packs are unloaded
Low All workers
3 Cut and nail timber
  • Saw kickback and cuts
  • Nail gun discharge into the body
  • Noise
  • Wood dust, including hardwood and MDF dust
  • Treated timber dust
High
  • Keep blade guards working; support work on a bench, not your leg
  • Use sequential (single-shot) trigger nail guns; disconnect before clearing jams
  • Wear safety glasses and hearing protection
  • Cut with dust extraction where possible and wear a P2 respirator
Low All workers
4 Stand and brace wall frames
  • Frames falling over
  • Wind loading on standing frames
  • Strain from lifting frames
High
  • Lift frames with enough people or a frame lifter
  • Fix temporary bracing as each frame goes up
  • Stop standing frames in strong wind
Low Supervisor
5 Install roof framing and trusses
  • Falls of more than 2 metres from the top plate or roof
  • Trusses toppling like dominoes
  • Crane loads swinging or falling
High
  • Install scaffold or edge protection around the building before roof work
  • Work from scaffold or a platform, not by walking the top plate
  • Brace each truss as it is fixed, following the truss layout
  • A licensed dogger slings and directs crane lifts; nobody stands under the load
Medium Supervisor / dogger
6 Work around stairwells, voids and floor openings
  • Falling through openings
High
  • Cover openings with fixed, marked covers or install guardrails
  • Never remove a cover without putting other protection in place
Low All workers
7 Clean up
  • Nails and off-cuts underfoot
  • Dust left on site
Low
  • Clear off-cuts into bins daily
  • Sweep with a damp method or vacuum; don't dry-sweep fine dust
Low All workers

Rules that apply to carpentry work

  • Wall frames are braced as they go up, so wind or a knock can't push them over.
  • Roof framing needs edge protection, scaffold or another fall control before anyone works at the edge.
  • Hardwood dust and MDF dust are carcinogens: cut with extraction and wear a P2 respirator.
  • If a crane lifts trusses or frames, the person slinging and directing the load needs a dogging licence.

Questions

Does every carpentry job need a SWMS?
No. A SWMS is required when the work is high risk construction work, such as a fall risk of more than 2 metres, working near moving plant, or structural alterations that need temporary support. Small fit-out jobs at ground level usually don't, but many builders ask for one anyway.
What are the main hazards for carpenters?
Falls from frames, roofs and ladders, nail gun injuries, saw cuts, manual handling strain, noise and wood dust. Hardwood and MDF dust are classed as carcinogens, so cut with extraction and wear a respirator.
Who can sling roof trusses for a crane lift?
Someone with a dogging high risk work licence. They choose the slinging method and direct the crane operator when the operator can't see the load.
Is this carpentry SWMS free to use?
Yes. Download it as Word or PDF with no sign-up, or open it in the online builder to change the steps and add your business details first. Check it against your own job and site before you use it.

Attach the SWMS to every job

Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.

Book a meeting