Free template · Australia · Updated November 2026
Carpentry SWMS template
Carpentry needs a SWMS when it includes high risk construction work, most often a risk of falling more than 2 metres while standing frames or fixing trusses. This one covers site setup, moving timber, cutting and nailing, standing wall frames, roof framing at height, and clean-up. Change it to suit your job and download it.
Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.
The carpentry SWMS
7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.
- Work activity
- Carpentry for a residential build: setting out, wall framing, roof framing and truss installation, and fixing out, including work at height of more than 2 metres.
- High risk construction work
-
- Risk of a fall of more than 2 metres
- Where powered mobile plant is moving
- PPE
- Hard hat, Safety glasses, Hearing protection, Hi-vis clothing, Steel-cap boots, Work gloves, P2 respirator, Sun protection (hat, long sleeves, SPF 50+)
- Plant and equipment
- Circular saw, drop saw and nail guns
- Tested and tagged leads with RCD
- Industrial ladders and trestles
- Scaffold and roof edge protection
- Crane or telehandler for lifting trusses (if used)
- Licences and training
- General construction induction (White Card)
- Trade qualification or supervised apprentice
- Dogging licence (DG) for slinging crane loads
- Working at heights training
| # | Job step | Hazards | Risk | Control measures | Residual | Responsible |
|---|---|---|---|---|---|---|
| 1 | Set up the site and work area |
| Medium |
| Low | Supervisor |
| 2 | Unload and move timber |
| Medium |
| Low | All workers |
| 3 | Cut and nail timber |
| High |
| Low | All workers |
| 4 | Stand and brace wall frames |
| High |
| Low | Supervisor |
| 5 | Install roof framing and trusses |
| High |
| Medium | Supervisor / dogger |
| 6 | Work around stairwells, voids and floor openings |
| High |
| Low | All workers |
| 7 | Clean up |
| Low |
| Low | All workers |
Rules that apply to carpentry work
- Wall frames are braced as they go up, so wind or a knock can't push them over.
- Roof framing needs edge protection, scaffold or another fall control before anyone works at the edge.
- Hardwood dust and MDF dust are carcinogens: cut with extraction and wear a P2 respirator.
- If a crane lifts trusses or frames, the person slinging and directing the load needs a dogging licence.
Questions
Does every carpentry job need a SWMS?
What are the main hazards for carpenters?
Who can sling roof trusses for a crane lift?
Is this carpentry SWMS free to use?
More SWMS templates
- Working at heights
- Electrical
- Plumbing
- Air conditioning
- Solar installation
- Roofing
- Scaffolding
- Concreting
- Excavation
- Demolition
- Painting
- Tiling
- Landscaping
- Builders clean
- Pest control
By state: SWMS template NSW · SWMS template QLD · SWMS template VIC · SWMS template WA · SWMS template SA · Blank SWMS template
Attach the SWMS to every job
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.
Book a meeting