Free template · Word & PDF · Updated November 2026
Plumbing contract template
A plumbing contract sets out the work, who supplies the fixtures, the price, permits and inspections, what happens if you open a wall and find a problem, and how long your labor is guaranteed. This one is filled in for a typical bathroom rough-in and fixture job. Edit it below and download it as Word or PDF, free and with no sign-up.
Free, no sign-up. Also called a plumbing service contract, plumbing service agreement, plumbing agreement.
The plumbing contract
The whole contract, exactly as it downloads. The blank lines are for your business and your client's details; fill them in online or after you download.
Plumbing Services Contract
This agreement is between the Contractor and the Client named below. It starts on .
1. Parties
| Contractor Phone: Email: |
Client Phone: Email: |
2. Property and term
| Service address | |
| Start date | |
| Term | Work starts on the start date and is expected to take 3 working days, plus the inspection. Permit and inspection scheduling, back-ordered fixtures or hidden conditions may move the schedule. |
3. Services and price
| Service | How often | Price |
|---|---|---|
| Remove old tub, toilet and vanity; cap lines | One time | $650 |
| Rough-in for new shower valve, vanity drain and supply, and toilet flange | One time | $2,200 |
| Set toilet, vanity faucet and shower trim after tile (fixtures supplied by Client) | One time | $750 |
| Permit and inspection | One time | $250 |
Included:
- Licensed plumber on site for all work
- Pipe, fittings, valves and connectors for the rough-in
- Pulling the permit and attending the inspection
- Pressure-testing new lines
- Hauling away old fixtures
- Cleaning up the work area
Not included (quoted separately if the Client asks for it):
- Fixtures, faucets and trim kits (supplied by the Client)
- Drywall, tile, flooring and paint repairs
- Replacing old pipes outside the bathroom
- Electrical work
- Fixing code problems found in existing plumbing (quoted before starting)
- Work after hours or on weekends unless agreed
4. Payment
| Billing | 25% deposit on signing, 50% after rough-in passes inspection, 25% when fixtures are set |
| Payment due | Each payment due on the milestone |
| Payment methods | Card, bank transfer (ACH) or check |
| Deposit | 25% deposit, or the maximum your state allows if lower |
| Late payment | 1.5% per month on balances more than 30 days overdue |
If an invoice is more than 30 days overdue, the Contractor may pause services until it is paid.
5. Ending the agreement
The Client may cancel before work starts and get the deposit back, less permit fees paid and materials that can't be returned. After work starts, the Client pays for work done and materials used. For contracts signed at the Client's home, federal and state rules may give the Client a short window to cancel (the FTC cooling-off rule gives 3 business days for many sales made at the home).
Either party may end the agreement straight away if the other seriously breaks it and doesn't fix the problem within 7 days of being told in writing.
6. Other terms
6.1 License, permits and inspection. All work is done or supervised by a plumber licensed in the state. The Contractor will pull required permits and arrange inspections. The work is complete when it passes final inspection.
6.2 Hidden conditions. If opening walls or floors shows corroded or failing pipes, code violations or other hidden problems, the Contractor will stop, explain the options and price, and only continue with the Client's written approval.
6.3 Fixtures. The Client will have Client-supplied fixtures on site before the trim-out visit. A return trip because fixtures are missing or wrong is charged at $95. The Contractor's warranty covers the installation, not Client-supplied products.
6.4 Labor warranty. The Contractor will fix leaks or failures caused by its workmanship reported within 1 year of completion, at no charge. The warranty doesn't cover freezing, misuse, clogs from what goes down the drain, or work altered by others.
6.5 Water shut-off. The water supply may need to be off for part of each work day. The Contractor will tell the Client when and for how long.
6.6 Change orders. Any change to the scope or price is agreed in writing (email is fine) before the work is done.
6.7 Access. The Client will give the Contractor safe access to the areas being serviced on the scheduled day, including unlocked gates, codes or keys where needed, and will keep pets secured. If the Contractor can't get access, the visit may be charged as completed.
6.8 Damage. The Contractor will repair or pay for damage caused by its negligence. The Client must report any damage within 48 hours of the visit, with photos where possible. The Contractor is not responsible for damage to items that were hidden, unmarked or already faulty.
6.9 Insurance. The Contractor carries general liability insurance and, where the law requires it, workers' compensation insurance, and will provide proof on request.
6.10 Independent contractor. The Contractor is an independent business, not an employee of the Client. The Contractor supplies its own equipment and decides how the work is done, and is responsible for its own taxes and staff.
6.11 Disputes. Both parties will try to settle any dispute by talking first. If that fails, either party may take it to small claims court or mediation in the county where the services are performed. This agreement is governed by the laws of the state where the services are performed.
6.12 Entire agreement. This document is the whole agreement between the parties. Any change must be in writing (email is fine) and accepted by both. If one part of the agreement can't be enforced, the rest still applies.
7. Signatures
By signing, both parties agree to the terms above.
| Name | Signature | Date | |
|---|---|---|---|
| Contractor | |||
| Client |
What to put in a plumbing contract
-
01
Say who supplies fixtures
If the client buys the toilet, faucets or water heater, say so, and that your warranty covers the installation, not the product. If you supply them, name the make and model.
-
02
Include permits and inspection
Most new plumbing, water heaters and gas work need a permit. Say you'll pull it, that the price includes it, and that the job isn't finished until it passes inspection.
-
03
Plan for what's behind the wall
Corroded pipes, old galvanized lines and code problems show up once walls are open. Agree that you'll stop and price anything you find before doing it.
-
04
Exclude patching and finishes
Plumbers open walls and floors; most don't patch them. Say drywall, tile and paint repairs aren't included unless you list them.
-
05
Give a labor warranty
State how long you guarantee your work (1 year is common) and what voids it, such as freezing, misuse or someone else altering it.
Not sure what to put in the price column? See how much to charge for plumbing .
Questions
What should a plumbing contract include?
Do plumbers need a contract for small repairs?
Who pulls the permit for plumbing work?
How long should a plumbing warranty be?
Is this plumbing contract template free?
Is this contract legally binding?
Contract templates for other trades
- Lawn care contract
- Cleaning contract
- Commercial cleaning contract
- Landscaping contract
- Snow removal contract
- HVAC contract
- Pest control contract
- Pool service contract
- Handyman contract
- Roofing contract
- Painting contract
- Electrical contract
- Pressure washing contract
- Tree service contract
Need something general? Start from a blank service agreement.
Run the job after the contract is signed
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. The signed contract sits on the job with the quote and photos, your crew sees the work on their phone, and the deposit and final invoice come from the same job.
Book a meeting