Free template · Word & PDF · Updated November 2026
Painting contract template
A painting contract sets out which rooms or surfaces you'll paint, the prep work, how many coats, which paint and colors, the price and payment schedule, and how touch-ups are handled. This one is filled in for a typical interior repaint. Edit it below and download it as Word or PDF, free and with no sign-up.
Free, no sign-up. Also called a painting contract, painting service agreement, house painting contract, painting subcontractor agreement.
The painting contract
The whole contract, exactly as it downloads. The blank lines are for your business and your client's details; fill them in online or after you download.
Painting Contract
This agreement is between the Contractor and the Client named below. It starts on .
1. Parties
| Contractor Phone: Email: |
Client Phone: Email: |
2. Property and term
| Service address | |
| Start date | |
| Term | Work starts on the start date and is expected to take 4 working days. Drying conditions, added work or late color choices may move the schedule. |
3. Services and price
| Service | How often | Price |
|---|---|---|
| Living room, dining room and hallway: walls, 2 coats | One time | $2,100 |
| Same rooms: ceilings, 1 coat flat white | One time | $650 |
| Same rooms: baseboards, door frames and 4 doors, 2 coats semi-gloss | One time | $900 |
| Drywall repair beyond normal prep | If needed | $65 per hour plus materials |
Included:
- Covering floors and furniture with drop cloths and plastic
- Removing and replacing outlet and switch covers
- Filling nail holes and small cracks, sanding and caulking gaps
- Spot-priming repaired areas
- Paint and materials (brand, line and sheen as agreed; colors chosen by the Client)
- Daily cleanup and a final walk-through with touch-ups
Not included (quoted separately if the Client asks for it):
- Closets, cabinets and rooms not listed above
- Repairing large drywall damage, water stains or plaster cracks
- Wallpaper removal
- Moving heavy furniture, pianos or electronics
- Extra coats needed for a large color change (quoted before starting)
- Lead abatement
4. Payment
| Billing | 30% deposit on signing, balance on completion after the final walk-through |
| Payment due | Final payment due on completion |
| Payment methods | Card, bank transfer (ACH) or check |
| Deposit | 30% deposit, or the maximum your state allows if lower |
| Late payment | 1.5% per month on balances more than 30 days overdue |
If an invoice is more than 30 days overdue, the Contractor may pause services until it is paid.
5. Ending the agreement
The Client may cancel before work starts and get the deposit back, less the cost of any paint already tinted to the Client's colors. After work starts, the Client pays for work done and materials used. For contracts signed at the Client's home, federal and state rules may give the Client a short window to cancel (the FTC cooling-off rule gives 3 business days for many sales made at the home).
Either party may end the agreement straight away if the other seriously breaks it and doesn't fix the problem within 7 days of being told in writing.
6. Other terms
6.1 Colors and products. The Client will choose all colors at least 3 days before the start date. Color changes after paint is tinted are charged at the cost of the new paint plus the labor to apply it.
6.2 Lead-safe work. If the home was built before 1978, the Contractor will follow the EPA Renovation, Repair and Painting rule, including using a certified firm and lead-safe work practices when painted surfaces are disturbed.
6.3 Surface condition. Paint can't fix the surface under it. The Contractor isn't responsible for existing cracks, peeling caused by moisture, or old paint that fails because of poor adhesion beneath it. These will be pointed out before work starts where visible.
6.4 Touch-ups and warranty. Before the final payment, the Contractor and Client walk through the work and the Contractor fixes everything on the touch-up list. The Contractor will fix peeling or blistering caused by its workmanship reported within 1 year of completion.
6.5 Change orders. Rooms or surfaces added after this agreement is signed are priced and agreed in writing (email is fine) before the work is done.
6.6 Access. The Client will give the Contractor safe access to the areas being serviced on the scheduled day, including unlocked gates, codes or keys where needed, and will keep pets secured. If the Contractor can't get access, the visit may be charged as completed.
6.7 Damage. The Contractor will repair or pay for damage caused by its negligence. The Client must report any damage within 48 hours of the visit, with photos where possible. The Contractor is not responsible for damage to items that were hidden, unmarked or already faulty.
6.8 Insurance. The Contractor carries general liability insurance and, where the law requires it, workers' compensation insurance, and will provide proof on request.
6.9 Independent contractor. The Contractor is an independent business, not an employee of the Client. The Contractor supplies its own equipment and decides how the work is done, and is responsible for its own taxes and staff.
6.10 Disputes. Both parties will try to settle any dispute by talking first. If that fails, either party may take it to small claims court or mediation in the county where the services are performed. This agreement is governed by the laws of the state where the services are performed.
6.11 Entire agreement. This document is the whole agreement between the parties. Any change must be in writing (email is fine) and accepted by both. If one part of the agreement can't be enforced, the rest still applies.
7. Signatures
By signing, both parties agree to the terms above.
| Name | Signature | Date | |
|---|---|---|---|
| Contractor | |||
| Client |
What to put in a painting contract
-
01
List every surface
Walls, ceilings, trim, doors, closets and cabinets are all separate decisions. Name each room and each surface so nobody is surprised that the closets weren't included.
-
02
Describe the prep
Prep is most of the work and the first thing clients question. Say what you'll do: fill nail holes and small cracks, sand, caulk gaps, spot-prime repairs. Bigger drywall repairs are extra.
-
03
Name the paint and coats
Write the brand, product line and sheen, and how many coats. Say the client picks colors before the start date, and that a dark-to-light change may need an extra coat at extra cost.
-
04
Follow lead-safe rules on older homes
For homes built before 1978, the EPA's Renovation, Repair and Painting rule requires firms that disturb painted surfaces to be certified and use lead-safe work practices. Say how you'll handle it.
-
05
Agree on furniture and access
Say whether you move furniture or the client clears the room, and who takes down pictures, curtains and outlet covers.
-
06
Set up a touch-up walk-through
Do a walk-through at the end with blue tape and fix everything on the list before the final payment. It closes the job cleanly.
Not sure what to put in the price column? See how much to charge for painting .
Questions
What should a painting contract include?
How much deposit should a painter take?
Do painters need lead certification?
Is a painting estimate the same as a contract?
Is this painting contract template free?
Is this contract legally binding?
Contract templates for other trades
- Lawn care contract
- Cleaning contract
- Commercial cleaning contract
- Landscaping contract
- Snow removal contract
- HVAC contract
- Pest control contract
- Pool service contract
- Handyman contract
- Roofing contract
- Electrical contract
- Plumbing contract
- Pressure washing contract
- Tree service contract
Need something general? Start from a blank service agreement.
Run the job after the contract is signed
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. The signed contract sits on the job with the quote and photos, your crew sees the work on their phone, and the deposit and final invoice come from the same job.
Book a meeting