Free template · Word & PDF · Updated November 2026
Handyman contract template
A handyman contract lists the jobs you'll do, how you'll charge (by the hour plus materials, or a fixed price), when payment is due and what happens if the client adds work. This one is filled in for a typical list of small home repairs, with a minimum charge, a materials markup and a clear line on licensed trade work. Edit it below and download it as Word or PDF, free and with no sign-up.
Free, no sign-up. Also called a handyman service agreement, handyman service contract, handyman agreement.
The handyman contract
The whole contract, exactly as it downloads. The blank lines are for your business and your client's details; fill them in online or after you download.
Handyman Services Agreement
This agreement is between the Contractor and the Client named below. It starts on .
1. Parties
| Contractor Phone: Email: |
Client Phone: Email: |
2. Property and term
| Service address | |
| Start date | |
| Term | Work starts on the start date and is expected to take 2 days. The timeline may move for added work, parts on back order, or hidden problems found once work starts. |
3. Services and price
| Service | How often | Price |
|---|---|---|
| Replace bathroom faucet and supply lines (like-for-like, no new plumbing) | One time | $180 |
| Patch and paint 3 drywall holes in the hallway | One time | $240 |
| Hang 2 interior doors and adjust hardware | One time | $300 |
| Any additional tasks the Client adds in writing | As agreed | $75 per hour plus materials |
Included:
- Labor for the tasks listed above
- Standard fasteners, caulk, patching compound and small consumables
- Protecting floors and furniture in the work area
- Cleaning up the work area and removing job debris at the end of each day
- A walk-through with the Client when the work is finished
Not included (quoted separately if the Client asks for it):
- Materials and fixtures not listed above (charged at cost plus 15%)
- Electrical, gas, new plumbing or structural work that needs a licensed contractor
- Permits, if the work turns out to need one
- Repairing hidden damage found once work starts (quoted before any extra work)
- Disposal of old appliances or large items
- Painting beyond the patched areas
4. Payment
| Billing | Invoiced when the work is finished. Hourly work has a 2-hour minimum, and a $50 trip charge applies to return visits the Client asks for that aren't covered by this agreement |
| Payment due | Due on completion |
| Payment methods | Card, bank transfer (ACH) or check |
| Deposit | Materials paid upfront for jobs over $500, or the maximum your state allows if lower |
| Late payment | 1.5% per month on balances more than 30 days overdue |
If an invoice is more than 30 days overdue, the Contractor may pause services until it is paid.
5. Ending the agreement
The Client may cancel before work starts and will be refunded any deposit, less the cost of materials already bought that can't be returned. After work starts, the Client pays for work done and materials bought up to the cancellation. For contracts signed at the Client's home, federal and state rules may give the Client a short window to cancel (the FTC cooling-off rule gives 3 business days for many sales made at the home).
Either party may end the agreement straight away if the other seriously breaks it and doesn't fix the problem within 7 days of being told in writing.
6. Other terms
6.1 Licensed work. The Contractor will not do work that state or local law says must be done by a licensed electrician, plumber, gas fitter or general contractor. If a task turns out to need one, the Contractor will stop and tell the Client, and that task is removed from this agreement.
6.2 Hidden conditions. If the Contractor finds rot, mold, water damage or another hidden problem once work starts, the Contractor will stop that task and explain the options and price. Extra work is only done with the Client's written approval.
6.3 Change orders. Tasks added after this agreement is signed are added in writing (text or email is fine) with their price before the Contractor starts them.
6.4 Client-supplied materials. If the Client supplies materials or fixtures, the Contractor's warranty covers the installation only, not the parts themselves.
6.5 Workmanship warranty. The Contractor will fix any problem caused by its workmanship that the Client reports within 90 days of completion, at no charge.
6.6 Access. The Client will give the Contractor safe access to the areas being serviced on the scheduled day, including unlocked gates, codes or keys where needed, and will keep pets secured. If the Contractor can't get access, the visit may be charged as completed.
6.7 Damage. The Contractor will repair or pay for damage caused by its negligence. The Client must report any damage within 48 hours of the visit, with photos where possible. The Contractor is not responsible for damage to items that were hidden, unmarked or already faulty.
6.8 Insurance. The Contractor carries general liability insurance and, where the law requires it, workers' compensation insurance, and will provide proof on request.
6.9 Independent contractor. The Contractor is an independent business, not an employee of the Client. The Contractor supplies its own equipment and decides how the work is done, and is responsible for its own taxes and staff.
6.10 Disputes. Both parties will try to settle any dispute by talking first. If that fails, either party may take it to small claims court or mediation in the county where the services are performed. This agreement is governed by the laws of the state where the services are performed.
6.11 Entire agreement. This document is the whole agreement between the parties. Any change must be in writing (email is fine) and accepted by both. If one part of the agreement can't be enforced, the rest still applies.
7. Signatures
By signing, both parties agree to the terms above.
| Name | Signature | Date | |
|---|---|---|---|
| Contractor | |||
| Client |
What to put in a handyman contract
-
01
Write the job list item by item
"General repairs" invites arguments. List each task (hang 3 doors, patch 2 drywall holes, replace a faucet) so both sides know when the job is done.
-
02
Say how you charge
Hourly plus materials suits open-ended work; a fixed price suits a clear list. If you charge hourly, give an estimate of hours and say you'll check in before going more than 20% over.
-
03
Set a minimum charge and trip fee
Small jobs cost you the drive and setup. A minimum charge (for example, 2 hours) and a trip fee for return visits caused by the client keep small jobs worth doing.
-
04
Be clear about materials
Say whether you buy materials and at what markup, or whether the client supplies them. If the client supplies parts, say you don't warranty those parts.
-
05
Know your license limits
Many states cap the job size a handyman can take without a contractor's license and require licensed trades for electrical, plumbing, gas and structural work. Check your state's rules and say in the contract what you won't do.
-
06
Use change orders
Clients add "one more thing" all the time. Agree that extra tasks are added in writing (a text or email is fine) with the price before you start them.
Not sure what to put in the price column? See how much to charge for handyman .
Questions
Do handymen need a contract?
What should a handyman contract include?
How much can a handyman do without a license?
Should a handyman charge by the hour or by the job?
Is this handyman contract template free?
Is this contract legally binding?
Contract templates for other trades
- Lawn care contract
- Cleaning contract
- Commercial cleaning contract
- Landscaping contract
- Snow removal contract
- HVAC contract
- Pest control contract
- Pool service contract
- Roofing contract
- Painting contract
- Electrical contract
- Plumbing contract
- Pressure washing contract
- Tree service contract
Need something general? Start from a blank service agreement.
Run the job after the contract is signed
Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. The signed contract sits on the job with the quote and photos, your crew sees the work on their phone, and the deposit and final invoice come from the same job.
Book a meeting