# Working at heights SWMS template

Any construction work where someone could fall more than 2 metres is high risk construction work, so it needs a SWMS before it starts. This one covers planning the access, setting up edge protection, scaffold or an EWP, harness use and rescue, falling objects and pack-down. Change the steps to match your job, add your details and download it.

Download Word Save as PDF [Edit it online](https://www.fieldmox.com/templates/swms?trade=working-at-heights#builder)

Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.

## The working at heights SWMS

7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.

Work activity

Work at height of more than 2 metres on a building, using edge protection, scaffold, elevating work platforms (EWPs), ladders and fall-arrest equipment.

High risk construction work

-   Risk of a fall of more than 2 metres

PPE

Hard hat, Hi-vis clothing, Steel-cap boots, Work gloves, Fall-arrest harness, Sun protection (hat, long sleeves, SPF 50+)

Plant and equipment

-   Mobile scaffold or fixed scaffold
-   Scissor lift or boom lift (EWP)
-   Industrial ladders (AS/NZS 1892)
-   Harness, lanyard, shock absorber and rated anchor points
-   Tool lanyards, barricades and signs

Licences and training

-   General construction induction (White Card)
-   Working at heights training
-   EWP operator training for the unit used; WP high risk work licence for booms of 11 m or more
-   Scaffolding licence (SB/SI/SA) for scaffold over 4 m
-   Rescue training for anyone using a harness

Job steps, hazards, risk ratings and control measures

#

Job step

Hazards

Risk

Control measures

Residual

Responsible

1

Plan the job and check the site

-   Unprotected edges, openings and voids
-   Fragile roofs, skylights and sheeting
-   Overhead powerlines
-   Soft or uneven ground
-   Wind, rain and heat

High

-   Walk the site before work and mark every edge, opening and fragile surface
-   Check the distance to overhead powerlines and stay outside the state's no-go zone
-   Check the weather forecast and stop work in high wind, rain or lightning
-   Write the rescue plan and brief the crew at the pre-start talk
-   Every worker reads and signs this SWMS before starting

Medium

Supervisor

2

Choose the access and fall protection

-   Falls from height
-   Using the wrong equipment for the task

High

-   Do the work from the ground where possible (prefabricate, use extension poles)
-   Use edge protection or scaffold before an EWP, and an EWP before a harness
-   Use fall restraint so the worker can't reach the edge before considering fall arrest
-   Ladders only for short, light work where 3 points of contact can be kept

Medium

Supervisor

3

Set up the scaffold, EWP or ladder

-   Platform or ladder tipping over
-   Unstable or sloping ground
-   Contact with structures or powerlines
-   People walking underneath

High

-   Check the ground is firm and level; use sole boards and outriggers as the manufacturer requires
-   Do the EWP pre-start check and fill in the logbook before use
-   Scaffold over 4 m erected by a licensed scaffolder, with a handover certificate before use
-   Secure ladders top and bottom, set at 4:1, and extend 1 m above the landing
-   Barricade and sign an exclusion zone below the work area

Low

Operator / scaffolder

4

Fit and check the harness system

-   Equipment failure
-   Anchor point not rated
-   Swing fall or long free fall
-   Suspension trauma after a fall

High

-   Inspect the harness, lanyard and shock absorber before every use; tag out damaged gear
-   Use only anchor points rated for fall arrest (15 kN per person) or certified anchors
-   Keep the anchor above the worker and close to the work to limit free fall and swing
-   Never work alone in a harness; the rescue gear and trained rescuer are on site

Medium

Supervisor / worker

5

Do the work at height

-   Falling tools and materials
-   Overreaching
-   Fatigue and heat stress

High

-   Use tool lanyards and toe boards; keep materials away from edges
-   Keep the exclusion zone below in place until the work is finished
-   Move the platform or ladder instead of overreaching
-   Take breaks, drink water and use shade; start early on hot days

Low

All workers

6

Lift materials up and down

-   Dropped loads
-   Manual handling injuries
-   Loads catching the wind

Medium

-   Use a materials hoist, gin wheel or crane instead of carrying loads up ladders
-   Use tag lines and keep people out from under the load
-   Team lift anything over 20 kg or awkward to hold

Low

All workers

7

Pack down and leave the site safe

-   Falls while dismantling
-   Unsecured edges left for others

Medium

-   Dismantle scaffold in the reverse order it was built, by the licensed scaffolder
-   Lower the EWP fully and isolate it before leaving
-   Leave edge protection or covers in place, or hand over to the next trade in writing

Low

Supervisor

## Rules that apply to working at heights work

-   Use the highest control you can: work from the ground, then edge protection or scaffold, then an EWP, then fall restraint, and fall arrest last.
-   Scaffold where a person or object could fall more than 4 metres must be erected, altered and dismantled by someone with a scaffolding high risk work licence.
-   A boom-type EWP with a boom of 11 metres or more needs a WP high risk work licence. Smaller EWPs still need the operator to be trained on that unit.
-   Fall-arrest gear is inspected before each use and by a competent person at least every 6 months (AS/NZS 1891.4).
-   Have a rescue plan before anyone works in a harness. A person hanging in a harness needs to be reached within minutes.

## Questions

When do you need a SWMS for working at heights?

When the construction work involves a risk of someone falling more than 2 metres. That makes it high risk construction work, and a SWMS has to be prepared before the work starts. Under 2 metres you still have to manage the fall risk, but a SWMS isn't legally required.

Is a harness enough to work at heights?

Usually not. A harness only stops a fall that has already happened, so it sits at the bottom of the hierarchy of controls. Use edge protection, scaffold or an EWP first, and only use fall arrest when those aren't reasonably practicable, with a rescue plan in place.

Who can put up scaffold over 4 metres?

Someone with the right scaffolding high risk work licence (basic, intermediate or advanced, depending on the scaffold). The licence is needed wherever a person or object could fall more than 4 metres from the scaffold.

Is this working at heights SWMS free to use?

Yes. Download it as Word or PDF with no sign-up, or open it in the online builder to change the steps and add your business details first. Check it against your own job and site before you use it.

## More SWMS templates

-   [Electrical](https://www.fieldmox.com/templates/swms/electrical)
-   [Carpentry](https://www.fieldmox.com/templates/swms/carpentry)
-   [Plumbing](https://www.fieldmox.com/templates/swms/plumbing)
-   [Air conditioning](https://www.fieldmox.com/templates/swms/air-conditioning)
-   [Solar installation](https://www.fieldmox.com/templates/swms/solar)
-   [Roofing](https://www.fieldmox.com/templates/swms/roofing)
-   [Scaffolding](https://www.fieldmox.com/templates/swms/scaffolding)
-   [Concreting](https://www.fieldmox.com/templates/swms/concreting)
-   [Excavation](https://www.fieldmox.com/templates/swms/excavation)
-   [Demolition](https://www.fieldmox.com/templates/swms/demolition)
-   [Painting](https://www.fieldmox.com/templates/swms/painting)
-   [Tiling](https://www.fieldmox.com/templates/swms/tiling)
-   [Landscaping](https://www.fieldmox.com/templates/swms/landscaping)
-   [Builders clean](https://www.fieldmox.com/templates/swms/cleaning)
-   [Pest control](https://www.fieldmox.com/templates/swms/pest-control)

By state: [SWMS template NSW](https://www.fieldmox.com/templates/swms/nsw) · [SWMS template QLD](https://www.fieldmox.com/templates/swms/qld) · [SWMS template VIC](https://www.fieldmox.com/templates/swms/vic) · [SWMS template WA](https://www.fieldmox.com/templates/swms/wa) · [SWMS template SA](https://www.fieldmox.com/templates/swms/sa) · [Blank SWMS template](https://www.fieldmox.com/templates/swms)

## Attach the SWMS to every job

Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.

[Book a meeting](https://www.fieldmox.com/book)