# Scaffolding SWMS template

Erecting and dismantling scaffold involves a risk of falling more than 2 metres, so it is high risk construction work and needs a SWMS. This one covers planning, delivery, the base, erecting each lift, edge protection and ties, the handover inspection, and dismantling. Change it for your scaffold and download it.

Download Word Save as PDF [Edit it online](https://www.fieldmox.com/templates/swms?trade=scaffolding#builder)

Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.

## The scaffolding SWMS

7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.

Work activity

Erection, alteration and dismantling of modular scaffold to a two-storey building, more than 4 metres high, including handover to other trades.

High risk construction work

-   Risk of a fall of more than 2 metres

PPE

Hard hat, Safety glasses, Hi-vis clothing, Steel-cap boots, Work gloves, Fall-arrest harness, Sun protection (hat, long sleeves, SPF 50+)

Plant and equipment

-   Modular scaffold components
-   Sole boards and base plates
-   Gin wheel or materials hoist
-   Harness and lanyard
-   Scaffold tags and handover certificates
-   Barricades and signs

Licences and training

-   General construction induction (White Card)
-   Scaffolding licence (SB, SI or SA) for scaffold over 4 metres
-   Working at heights training

Job steps, hazards, risk ratings and control measures

#

Job step

Hazards

Risk

Control measures

Residual

Responsible

1

Plan the scaffold and check the site

-   Overhead powerlines
-   Unstable or sloping ground
-   Public and traffic nearby
-   Wind and weather

High

-   Use the scaffold design or plan and the manufacturer's instructions
-   Check the distance to powerlines and arrange shrouding or isolation with the network operator if needed
-   Check ground bearing and slope; plan sole boards
-   Arrange council or traffic approvals for scaffold over footpaths
-   Every worker reads and signs this SWMS

Medium

Supervisor

2

Unload and move components

-   Manual handling strain
-   Falling components
-   Trucks reversing

Medium

-   Use a spotter for trucks
-   Team lift long components; stack them neatly on level ground
-   Wear gloves

Low

All workers

3

Set up the base

-   Scaffold collapse from poor footing

High

-   Place sole boards and base plates on firm ground
-   Level and plumb the first lift before going higher
-   Never use bricks or loose packing under base plates

Low

Licensed scaffolder

4

Erect each lift

-   Falls from the scaffold
-   Dropped components
-   Overreaching

High

-   Install guardrails and toe boards on each lift as it is completed
-   Use a harness attached to a suitable point where edge protection isn't yet in place
-   Raise components with a gin wheel or hoist, not by throwing them
-   Keep an exclusion zone below while erecting

Medium

Licensed scaffolder

5

Install ties, access and containment

-   Scaffold overturning
-   Falls on stairs and ladders
-   Debris falling to the public

High

-   Tie the scaffold to the structure at the spacings in the design
-   Install stair access or secured ladders with handrails
-   Fit containment mesh or screens where debris could fall on people

Low

Licensed scaffolder

6

Inspect and hand over

-   Incomplete or altered scaffold used by others

High

-   Inspect the completed scaffold and issue a handover certificate and green tag
-   Tag incomplete scaffold 'Incomplete, do not use' and block access
-   Re-inspect after alterations, storms and at least every 30 days

Low

Licensed scaffolder

7

Dismantle

-   Falls
-   Removing ties too early
-   Dropped components

High

-   Dismantle from the top down, in the reverse order of erection
-   Remove ties only as the scaffold above them is removed
-   Lower components by hoist; keep the exclusion zone in place

Medium

Licensed scaffolder

## Rules that apply to scaffolding work

-   A scaffolding high risk work licence (basic, intermediate or advanced) is needed to erect, alter or dismantle scaffold where a person or object could fall more than 4 metres.
-   Scaffold over 4 metres is inspected by a competent person before first use, after alterations or repairs, after events like storms, and at least every 30 days.
-   Follow the manufacturer's instructions and AS/NZS 4576 (guidelines for scaffolding) and AS/NZS 1576 (scaffolding standards).
-   Install edge protection as each lift goes up rather than at the end.

## Questions

Do you need a licence to put up scaffold?

You need a scaffolding high risk work licence to erect, alter or dismantle scaffold where a person or object could fall more than 4 metres. Basic covers modular and prefabricated scaffold; intermediate and advanced cover more complex scaffolds such as cantilevered and hung scaffolds.

How often does scaffold need to be inspected?

Scaffold over 4 metres must be inspected by a competent person before it is first used, after any alteration or repair, after an event likely to affect it (such as a storm), and at least every 30 days.

What should a scaffold handover include?

A handover certificate stating the scaffold's duty rating and that it was inspected and is complete, plus a tag at each access point. Other trades must not alter the scaffold; only a licensed scaffolder can.

Is this scaffolding SWMS free to use?

Yes. Download it as Word or PDF with no sign-up, or open it in the online builder to change the steps and add your business details first. Check it against your own job and site before you use it.

## More SWMS templates

-   [Working at heights](https://www.fieldmox.com/templates/swms/working-at-heights)
-   [Electrical](https://www.fieldmox.com/templates/swms/electrical)
-   [Carpentry](https://www.fieldmox.com/templates/swms/carpentry)
-   [Plumbing](https://www.fieldmox.com/templates/swms/plumbing)
-   [Air conditioning](https://www.fieldmox.com/templates/swms/air-conditioning)
-   [Solar installation](https://www.fieldmox.com/templates/swms/solar)
-   [Roofing](https://www.fieldmox.com/templates/swms/roofing)
-   [Concreting](https://www.fieldmox.com/templates/swms/concreting)
-   [Excavation](https://www.fieldmox.com/templates/swms/excavation)
-   [Demolition](https://www.fieldmox.com/templates/swms/demolition)
-   [Painting](https://www.fieldmox.com/templates/swms/painting)
-   [Tiling](https://www.fieldmox.com/templates/swms/tiling)
-   [Landscaping](https://www.fieldmox.com/templates/swms/landscaping)
-   [Builders clean](https://www.fieldmox.com/templates/swms/cleaning)
-   [Pest control](https://www.fieldmox.com/templates/swms/pest-control)

By state: [SWMS template NSW](https://www.fieldmox.com/templates/swms/nsw) · [SWMS template QLD](https://www.fieldmox.com/templates/swms/qld) · [SWMS template VIC](https://www.fieldmox.com/templates/swms/vic) · [SWMS template WA](https://www.fieldmox.com/templates/swms/wa) · [SWMS template SA](https://www.fieldmox.com/templates/swms/sa) · [Blank SWMS template](https://www.fieldmox.com/templates/swms)

## Attach the SWMS to every job