# Plumbing SWMS template

Plumbers need a SWMS when the job includes high risk construction work, such as a trench deeper than 1.5 metres, work on pressurised gas piping, or an area that may have a contaminated atmosphere like a sewer. This one covers finding services, trenching, sewer work, gasfitting, hot work and testing. Edit it for your job and download it.

Download Word Save as PDF [Edit it online](https://www.fieldmox.com/templates/swms?trade=plumbing#builder)

Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.

## The plumbing SWMS

7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.

Work activity

Plumbing, drainage and gasfitting on a residential or commercial site, including excavating for drainage, connecting to existing sewer, and work on existing gas piping.

High risk construction work

-   Shaft or trench deeper than 1.5 m, or a tunnel
-   On or near pressurised gas mains or piping
-   Contaminated or flammable atmosphere

PPE

Safety glasses, Hearing protection, Hi-vis clothing, Steel-cap boots, Work gloves, Chemical-resistant gloves, P2 respirator, Sun protection (hat, long sleeves, SPF 50+)

Plant and equipment

-   Mini excavator (if used) and shoring boxes
-   Pipe cutters, drop saw, press tools
-   Oxy-acetylene or air-acetylene kit, fire extinguisher
-   Gas detector
-   Pressure test gauge
-   Tested and tagged tools with RCD

Licences and training

-   General construction induction (White Card)
-   Plumbing licence and gasfitting licence for the state
-   Confined space entry training (only if entering pits)
-   Hepatitis A and tetanus vaccinations recommended for sewer work

Job steps, hazards, risk ratings and control measures

#

Job step

Hazards

Risk

Control measures

Residual

Responsible

1

Locate services and set up

-   Striking buried gas, electrical or water services
-   Members of the public near the work

High

-   Get Before You Dig Australia plans and check them on site
-   Mark services and expose them by hand or vacuum excavation before machine digging
-   Barricade the work area and sign it
-   Every worker reads and signs this SWMS

Low

Supervisor

2

Excavate trenches for drainage

-   Trench collapse
-   Falling into the trench
-   Excavator striking people
-   Spoil falling back in

High

-   Shore, bench or batter trenches deeper than 1.5 m before entry
-   Keep spoil and materials at least 1 m back from the edge
-   Barricade open trenches and cover them at the end of each day
-   Keep an exclusion zone around the excavator; make eye contact with the operator before approaching
-   Use a ladder for getting in and out

Medium

Supervisor / operator

3

Work on existing sewer and stormwater

-   Sewer gases (hydrogen sulphide) and low oxygen
-   Infection from sewage (hepatitis A, leptospirosis)
-   Confined spaces in pits

High

-   Don't enter pits or manholes without a confined space assessment and permit
-   Use a gas detector before and during work near open sewers
-   Wear gloves and eye protection; wash hands before eating or smoking
-   Cover cuts and keep vaccinations up to date

Medium

Licensed plumber

4

Cut and join pipe

-   Asbestos cement pipe in older systems
-   Solvent cement fumes
-   Cuts and noise

High

-   Treat old grey fibre cement pipe as asbestos; don't cut it with power tools; follow your state's asbestos rules
-   Use solvent cement in a ventilated area and keep lids on
-   Use guarded cutters; wear gloves, glasses and hearing protection

Low

All workers

5

Gasfitting on existing gas piping

-   Gas leak, fire or explosion
-   Gas build-up in enclosed spaces

High

-   Isolate the gas at the meter and lock it off
-   No ignition sources nearby; ventilate the area
-   Purge lines safely to open air
-   Leak test with a gauge before turning the gas back on

Low

Licensed gasfitter

6

Brazing and soldering (hot work)

-   Burns
-   Fire in wall cavities and roof spaces
-   Gas cylinder failure

High

-   Get a hot work permit where the site requires one
-   Use a heat mat and keep a fire extinguisher at hand
-   Check the area for smouldering material after finishing
-   Secure cylinders upright with flashback arrestors fitted

Low

Licensed plumber

7

Test, commission and backfill

-   Pressure test failures
-   Scalding from hot water systems
-   Backfill collapsing on pipes

Medium

-   Pressure test to the required standard before backfilling
-   Set tempering valves so hot water delivered to bathrooms meets the plumbing code limit
-   Backfill and compact in layers; restore barricades until the surface is safe
-   Lodge the compliance certificate the state requires

Low

Licensed plumber

## Rules that apply to plumbing work

-   Get Before You Dig Australia plans before excavating, and expose services by hand or vacuum before using machines near them.
-   Trenches deeper than 1.5 metres need shoring, benching or battering before anyone goes in.
-   Never enter a sewer pit or tank unless it has been assessed as safe or you hold a confined space permit and training.
-   Asbestos cement pipe is common in older drainage: don't cut it with power tools.
-   Gasfitting and plumbing need a licence for the state the work is in, and gas work must be tested before handover.

## Questions

Do plumbers need a SWMS?

When the work is high risk construction work, yes. Common examples for plumbers are trenches deeper than 1.5 metres, work on or near pressurised gas piping, work near chemical or fuel lines, and areas that may have a contaminated atmosphere, such as sewers.

How deep can a trench be before it needs shoring?

A trench deeper than 1.5 metres is high risk construction work and needs a SWMS. The sides must be supported by shoring, benching or battering before anyone goes in. Shallower trenches can still collapse in poor soil, so assess them too.

Can I cut old asbestos cement pipe?

Not with power tools. Asbestos cement pipe should be handled with non-friable asbestos methods, such as hand tools and wetting, by someone trained, and some states limit how much you can remove without a licence. Check your state's rules before you start.

Is this plumbing SWMS free to use?

Yes. Download it as Word or PDF with no sign-up, or open it in the online builder to change the steps and add your business details first. Check it against your own job and site before you use it.

## More SWMS templates

-   [Working at heights](https://www.fieldmox.com/templates/swms/working-at-heights)
-   [Electrical](https://www.fieldmox.com/templates/swms/electrical)
-   [Carpentry](https://www.fieldmox.com/templates/swms/carpentry)
-   [Air conditioning](https://www.fieldmox.com/templates/swms/air-conditioning)
-   [Solar installation](https://www.fieldmox.com/templates/swms/solar)
-   [Roofing](https://www.fieldmox.com/templates/swms/roofing)
-   [Scaffolding](https://www.fieldmox.com/templates/swms/scaffolding)
-   [Concreting](https://www.fieldmox.com/templates/swms/concreting)
-   [Excavation](https://www.fieldmox.com/templates/swms/excavation)
-   [Demolition](https://www.fieldmox.com/templates/swms/demolition)
-   [Painting](https://www.fieldmox.com/templates/swms/painting)
-   [Tiling](https://www.fieldmox.com/templates/swms/tiling)
-   [Landscaping](https://www.fieldmox.com/templates/swms/landscaping)
-   [Builders clean](https://www.fieldmox.com/templates/swms/cleaning)
-   [Pest control](https://www.fieldmox.com/templates/swms/pest-control)

By state: [SWMS template NSW](https://www.fieldmox.com/templates/swms/nsw) · [SWMS template QLD](https://www.fieldmox.com/templates/swms/qld) · [SWMS template VIC](https://www.fieldmox.com/templates/swms/vic) · [SWMS template WA](https://www.fieldmox.com/templates/swms/wa) · [SWMS template SA](https://www.fieldmox.com/templates/swms/sa) · [Blank SWMS template](https://www.fieldmox.com/templates/swms)

## Attach the SWMS to every job