# Landscaping SWMS Template (Free, Australia) | Fieldmox

> Free landscaping SWMS for Australia: services, bobcats and excavators, retaining walls, pavers and chemicals. Edit online, download Word or PDF.

Source: https://www.fieldmox.com/templates/swms/landscaping

1.  [Home](https://www.fieldmox.com/)
3.  [Templates](https://www.fieldmox.com/templates)
5.  [SWMS template](https://www.fieldmox.com/templates/swms)
7.  Landscaping

Free template · Australia · Updated November 2026

# Landscaping SWMS template

Landscaping needs a SWMS when it includes high risk construction work, most often working where a bobcat or mini excavator is moving, or digging a trench deeper than 1.5 metres. This one covers finding services, machinery, retaining walls, cutting pavers, chemicals, power tools and heat. Edit it and download it.

Download Word Save as PDF [Edit it online](https://www.fieldmox.com/templates/swms?trade=landscaping#builder)

Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.

## The landscaping SWMS

7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.

Work activity

Landscape construction at a residential site: excavation with a mini loader and excavator, retaining walls, paving, turf, garden beds and irrigation.

High risk construction work

-   Where powered mobile plant is moving

PPE

Safety glasses, Hearing protection, Hi-vis clothing, Steel-cap boots, Work gloves, P2 respirator, Sun protection (hat, long sleeves, SPF 50+)

Plant and equipment

-   Mini loader (skid steer) and mini excavator
-   Plate compactor
-   Paver saw (wet cut) or grinder with extraction
-   Brushcutter, hedge trimmer, chainsaw
-   Wheelbarrows and trolleys

Licences and training

-   General construction induction (White Card)
-   Plant operator competency for loaders and excavators
-   Chemical user training (for herbicides) where the state requires it

Job steps, hazards, risk ratings and control measures

#

Job step

Hazards

Risk

Control measures

Residual

Responsible

1

Locate services and set up

-   Striking underground cables, gas and water pipes
-   Public and residents

High

-   Get Before You Dig Australia plans; pothole by hand near marked services
-   Fence or flag the work area; keep residents and pets out
-   Every worker reads and signs this SWMS

Medium

Supervisor

2

Operate the loader and excavator

-   Plant striking people
-   Rollover on slopes
-   Attachment falling off

High

-   Do the pre-start check; check the quick hitch pin
-   Operator wears the seatbelt; keep the machine off steep slopes and trench edges
-   Set an exclusion zone; nobody approaches until the operator stops and signals

Medium

Operator

3

Build retaining walls and dig footings

-   Excavation collapse
-   Manual handling of blocks and sleepers
-   Crushed hands

High

-   Batter or support excavations; keep spoil back from the edge
-   Follow the engineer's design for structural walls
-   Team lift heavy blocks and sleepers; use lifting clamps

Medium

Supervisor

4

Cut pavers, blocks and stone

-   Crystalline silica dust
-   Noise
-   Blade kickback

High

-   Cut wet or use on-tool extraction
-   Wear a P2 respirator, safety glasses and hearing protection
-   Keep others away while cutting

Low

All workers

5

Use power tools in gardens

-   Projectiles from brushcutters
-   Chainsaw cuts
-   Noise and vibration

Medium

-   Keep a 15 m clearance from people when brushcutting
-   Only trained workers use chainsaws, with chaps and a helmet with visor
-   Wear hearing protection and rotate tasks

Low

All workers

6

Apply herbicides and fertilisers

-   Skin and eye contact
-   Spray drift
-   Spills

Medium

-   Read the label and SDS; mix outdoors
-   Wear chemical-resistant gloves and glasses
-   Don't spray in wind; keep a spill kit in the vehicle

Low

All workers

7

Work in heat and sun

-   Heat stress
-   UV exposure

Medium

-   Start early; take breaks in shade
-   Drink water often
-   Wear sun protection

Low

Supervisor

## Rules that apply to landscaping work

-   Get Before You Dig Australia plans before digging. Irrigation and garden lighting are often near shallow electrical cables.
-   Cutting pavers, blocks and stone releases crystalline silica. Cut wet or with extraction and wear a P2 respirator.
-   Retaining walls over the height your council allows, or that support a load, need engineering.
-   Plant operators wear seatbelts, and nobody enters the machine's swing or travel path.

## Questions

Do landscapers need a SWMS?

When the job includes high risk construction work, yes. For landscapers that's usually working where a loader or excavator is moving, a trench deeper than 1.5 metres, or work next to a road in use. Garden maintenance alone doesn't need one.

Do I need a licence to drive a bobcat?

There is no high risk work licence for skid steers or excavators in Australia, but the operator must be competent and trained on the machine. Most builders ask for a verification of competency (VOC) or a statement of attainment.

How do I cut pavers safely?

Use a wet saw or a grinder with on-tool extraction, wear a P2 respirator, safety glasses and hearing protection, and keep other people away. Dry cutting concrete pavers releases crystalline silica.

Is this landscaping SWMS free to use?

Yes. Download it as Word or PDF with no sign-up, or open it in the online builder to change the steps and add your business details first. Check it against your own job and site before you use it.

## More SWMS templates

-   [Working at heights](https://www.fieldmox.com/templates/swms/working-at-heights)
-   [Electrical](https://www.fieldmox.com/templates/swms/electrical)
-   [Carpentry](https://www.fieldmox.com/templates/swms/carpentry)
-   [Plumbing](https://www.fieldmox.com/templates/swms/plumbing)
-   [Air conditioning](https://www.fieldmox.com/templates/swms/air-conditioning)
-   [Solar installation](https://www.fieldmox.com/templates/swms/solar)
-   [Roofing](https://www.fieldmox.com/templates/swms/roofing)
-   [Scaffolding](https://www.fieldmox.com/templates/swms/scaffolding)
-   [Concreting](https://www.fieldmox.com/templates/swms/concreting)
-   [Excavation](https://www.fieldmox.com/templates/swms/excavation)
-   [Demolition](https://www.fieldmox.com/templates/swms/demolition)
-   [Painting](https://www.fieldmox.com/templates/swms/painting)
-   [Tiling](https://www.fieldmox.com/templates/swms/tiling)
-   [Builders clean](https://www.fieldmox.com/templates/swms/cleaning)
-   [Pest control](https://www.fieldmox.com/templates/swms/pest-control)

By state: [SWMS template NSW](https://www.fieldmox.com/templates/swms/nsw) · [SWMS template QLD](https://www.fieldmox.com/templates/swms/qld) · [SWMS template VIC](https://www.fieldmox.com/templates/swms/vic) · [SWMS template WA](https://www.fieldmox.com/templates/swms/wa) · [SWMS template SA](https://www.fieldmox.com/templates/swms/sa) · [Blank SWMS template](https://www.fieldmox.com/templates/swms)

## Attach the SWMS to every job

Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. Save the SWMS on the job next to the quote and photos, so it's there when the builder asks for it, and add "SWMS read and signed" to the visit checklist your crew ticks off on their phone before they start.

[Book a meeting](https://www.fieldmox.com/book)
