# Demolition SWMS template

Demolishing a load-bearing or structural element is high risk construction work, and so is work likely to disturb asbestos, so demolition needs a SWMS before it starts. This one covers the hazardous materials survey, disconnecting services, site set-up, strip-out, structural and machine demolition, and waste. Edit it for your job and download it.

Download Word Save as PDF [Edit it online](https://www.fieldmox.com/templates/swms?trade=demolition#builder)

Free, no sign-up. The download adds a worker sign-on table and principal contractor approval.

## The demolition SWMS

7 job steps, from set-up to pack-down. Every step lists its hazards, risk before and after, and the controls.

Work activity

Demolition of an internal load-bearing wall and strip-out of a residential building, including removal of building materials and waste.

High risk construction work

-   Risk of a fall of more than 2 metres
-   Demolition of load-bearing or structural elements
-   Disturbing asbestos
-   Structural alterations needing temporary support
-   Where powered mobile plant is moving

PPE

Hard hat, Safety glasses, Hearing protection, Hi-vis clothing, Steel-cap boots, Cut-resistant gloves, P2 respirator, Coveralls

Plant and equipment

-   Temporary props and acrow props
-   Demolition saw, jackhammer, reciprocating saw
-   Excavator or mini loader with demolition attachments (if used)
-   Skip bins and chutes
-   Water spray for dust

Licences and training

-   General construction induction (White Card)
-   Demolition licence where the state requires one
-   Licensed asbestos removalist for asbestos removal
-   Plant operator competency

Job steps, hazards, risk ratings and control measures

#

Job step

Hazards

Risk

Control measures

Residual

Responsible

1

Survey for hazardous materials

-   Asbestos
-   Lead paint
-   Synthetic mineral fibres
-   PCBs in old light fittings

High

-   Get an asbestos and hazardous materials survey for buildings built before 1990
-   Have identified asbestos removed by a licensed removalist before demolition, with a clearance certificate
-   Treat lead paint with wet methods; no burning or dry sanding
-   Every worker reads and signs this SWMS

Medium

Supervisor

2

Disconnect services

-   Live electricity, gas or water in the structure

High

-   Have a licensed electrician and plumber disconnect and make safe all services
-   Get written confirmation the services are disconnected before work starts

Low

Supervisor

3

Set up the site

-   Falling debris hitting the public or other workers
-   Unauthorised entry

High

-   Install hoarding, fencing and overhead protection where debris could reach the public
-   Set exclusion zones around the demolition area and sign them

Low

Supervisor

4

Strip out linings, fixtures and fittings

-   Cuts from glass, metal and nails
-   Manual handling
-   Dust
-   Falling ceiling material

Medium

-   Wear cut-resistant gloves, glasses and a P2 respirator
-   Remove ceilings from below with a long tool, standing clear
-   Use chutes and bins; don't throw material from height

Low

All workers

5

Install temporary support and remove structural elements

-   Unplanned collapse
-   Falls from height
-   Crush injuries

High

-   Follow the engineer's demolition plan and sequence
-   Install props or temporary support as designed before removing load-bearing elements
-   Demolish from the top down, one element at a time
-   Keep everyone out of the collapse zone

Medium

Supervisor

6

Machine demolition and loading

-   Plant striking people
-   Falling material onto the cab
-   Overhead powerlines

High

-   Only the operator in the exclusion zone; use a spotter
-   Use plant fitted with operator protection (FOPS/ROPS)
-   Keep plant outside the powerline no-go zone

Medium

Operator

7

Control dust and remove waste

-   Silica dust from concrete and masonry
-   Dust leaving the site
-   Overloaded bins

Medium

-   Wet down material during demolition and loading
-   Wear P2 respirators; don't dry-sweep
-   Load bins below the rim and cover them for transport

Low

All workers

## Rules that apply to demolition work

-   Asbestos identified before demolition must be removed first, by a licensed asbestos removalist where the law requires one.
-   Get an engineer's demolition plan for structural elements, and install temporary support before removing anything load-bearing.
-   Some states and councils require a demolition licence or permit for certain work. Check before you quote.
-   Lead paint is common in homes built before 1970. Don't burn or dry-sand it.

## Questions

When does demolition need a SWMS?

When it involves demolishing an element that is load-bearing or related to the structure's integrity, structural alterations needing temporary support, or work likely to disturb asbestos. Strip-out of non-structural linings may not need one on its own, but it often comes with asbestos risk in older buildings.

Do I need an asbestos survey before demolition?

For buildings built before 1990, yes. Asbestos likely to be disturbed by the demolition has to be identified and, as far as reasonably practicable, removed before demolition starts. Friable asbestos and larger amounts of non-friable asbestos must be removed by a licensed removalist.

Do I need a licence to do demolition?

It depends on the state and the job. Some states require a demolition licence for certain demolition work, and councils may need a permit or notification. Check with your state's regulator before quoting.

Is this demolition SWMS free to use?

Yes. Download it as Word or PDF with no sign-up, or open it in the online builder to change the steps and add your business details first. Check it against your own job and site before you use it.

## More SWMS templates

-   [Working at heights](https://www.fieldmox.com/templates/swms/working-at-heights)
-   [Electrical](https://www.fieldmox.com/templates/swms/electrical)
-   [Carpentry](https://www.fieldmox.com/templates/swms/carpentry)
-   [Plumbing](https://www.fieldmox.com/templates/swms/plumbing)
-   [Air conditioning](https://www.fieldmox.com/templates/swms/air-conditioning)
-   [Solar installation](https://www.fieldmox.com/templates/swms/solar)
-   [Roofing](https://www.fieldmox.com/templates/swms/roofing)
-   [Scaffolding](https://www.fieldmox.com/templates/swms/scaffolding)
-   [Concreting](https://www.fieldmox.com/templates/swms/concreting)
-   [Excavation](https://www.fieldmox.com/templates/swms/excavation)
-   [Painting](https://www.fieldmox.com/templates/swms/painting)
-   [Tiling](https://www.fieldmox.com/templates/swms/tiling)
-   [Landscaping](https://www.fieldmox.com/templates/swms/landscaping)
-   [Builders clean](https://www.fieldmox.com/templates/swms/cleaning)
-   [Pest control](https://www.fieldmox.com/templates/swms/pest-control)

By state: [SWMS template NSW](https://www.fieldmox.com/templates/swms/nsw) · [SWMS template QLD](https://www.fieldmox.com/templates/swms/qld) · [SWMS template VIC](https://www.fieldmox.com/templates/swms/vic) · [SWMS template WA](https://www.fieldmox.com/templates/swms/wa) · [SWMS template SA](https://www.fieldmox.com/templates/swms/sa) · [Blank SWMS template](https://www.fieldmox.com/templates/swms)