# Roofing Contract Template (Free, Word & PDF) | Fieldmox

> Free roofing contract template: tear-off, decking per sheet, permits, warranties, insurance claims and cleanup. Edit online, download Word or PDF.

Source: https://www.fieldmox.com/templates/service-contract/roofing

1.  [Home](https://www.fieldmox.com/)
3.  [Templates](https://www.fieldmox.com/templates)
5.  [Service contract template](https://www.fieldmox.com/templates/service-contract)
7.  Roofing

Free template · Word & PDF · Updated November 2026

# Roofing contract template

A roofing contract sets out the scope of the roof job, the materials, the price, the payment schedule, the warranties and what happens if you find rotten decking once the old roof is off. This one is filled in for a typical asphalt shingle replacement on a house. Edit it below and download it as Word or PDF, free and with no sign-up.

[Edit it online](https://www.fieldmox.com/templates/service-contract?trade=roofing#builder) Download Word Save as PDF

Free, no sign-up. Also called a roofing contract, roof replacement contract, roofing agreement, roofing service agreement.

## The roofing contract

The whole contract, exactly as it downloads. The blank lines are for your business and your client's details; fill them in online or after you download.

# Roofing Contract

This agreement is between the Contractor and the Client named below. It starts on  .

## 1\. Parties

**Contractor**  
   
   
Phone:    
Email:  

**Client**  
   
   
Phone:    
Email:  

## 2\. Property and term

Service address

 

Start date

 

Term

Work starts within 2 weeks of the start date once permits and materials are in, and takes about 2 working days. Weather, permit delays, material shortages or hidden damage may move the schedule.

## 3\. Services and price

Service

How often

Price

Tear off existing shingles down to the deck (1 layer, about 24 squares)

One time

$3,600

Install synthetic underlayment, ice and water shield at eaves and valleys, new drip edge and pipe boots

One time

$2,400

Install architectural asphalt shingles (brand, line and color as chosen by the Client) with ridge vent

One time

$7,800

Replace damaged roof decking if found

As needed

$95 per 4x8 sheet installed

**Included:**

-   Building permit and required inspections
-   Protecting landscaping, siding and windows during tear-off
-   Dumpster and disposal of all old roofing material
-   Flashing replacement at walls and chimney where needed
-   Magnetic sweep of the yard and driveway for nails
-   A final walk-through with the Client and photos of the finished roof

**Not included** (quoted separately if the Client asks for it):

-   Damaged decking beyond the per-sheet price above
-   Gutter replacement or repair
-   Chimney masonry repairs
-   Skylight replacement
-   Fascia and soffit repairs
-   Additional layers of old roofing found during tear-off

## 4\. Payment

Billing

30% deposit on signing, 60% when materials are delivered to the site, 10% on completion and final inspection

Payment due

Each payment is due on the milestone; the final payment within 7 days of completion

Payment methods

Card, bank transfer (ACH), check, or insurance proceeds endorsed to the Contractor

Deposit

30% deposit, or the maximum your state allows if lower

Late payment

1.5% per month on balances more than 30 days overdue

If an invoice is more than 30 days overdue, the Contractor may pause services until it is paid.

## 5\. Ending the agreement

The Client may cancel before materials are ordered and get the deposit back in full. After materials are ordered, the Client pays for materials that can't be returned and any restocking fees. For contracts signed at the Client's home, federal and state rules may give the Client a short window to cancel (the FTC cooling-off rule gives 3 business days for many sales made at the home), and some states give extra rights for insurance claim work.

Either party may end the agreement straight away if the other seriously breaks it and doesn't fix the problem within 7 days of being told in writing.

## 6\. Other terms

**6.1 Hidden damage.** Rotten or damaged decking found after tear-off is replaced at the per-sheet price above. The Contractor will show the Client (or send photos) before covering it. Other hidden problems, such as damaged rafters, are quoted and approved in writing before the work is done.

**6.2 Permits and code.** The Contractor will get the building permit and arrange required inspections. If the building department requires work not listed here, it will be added by change order.

**6.3 Weather.** The Contractor will not leave the roof open overnight and will cover exposed areas if weather stops work. Weather delays move the schedule but not the price.

**6.4 Insurance claims.** If the job is paid by the Client's insurance, the Client is responsible for the deductible and for paying the Contractor when the insurer pays. Work the insurer approves after this agreement (supplements) is added by change order.

**6.5 Warranties.** Shingles and roofing products carry the manufacturer's warranty. The Contractor warrants its workmanship for 5 years from completion. The workmanship warranty doesn't cover damage from storms, falling trees, or other trades working on the roof.

**6.6 Change orders.** Any change to the scope or price is agreed in writing (email is fine) before the work is done.

**6.7 Access.** The Client will give the Contractor safe access to the areas being serviced on the scheduled day, including unlocked gates, codes or keys where needed, and will keep pets secured. If the Contractor can't get access, the visit may be charged as completed.

**6.8 Damage.** The Contractor will repair or pay for damage caused by its negligence. The Client must report any damage within 48 hours of the visit, with photos where possible. The Contractor is not responsible for damage to items that were hidden, unmarked or already faulty.

**6.9 Insurance.** The Contractor carries general liability insurance and, where the law requires it, workers' compensation insurance, and will provide proof on request.

**6.10 Independent contractor.** The Contractor is an independent business, not an employee of the Client. The Contractor supplies its own equipment and decides how the work is done, and is responsible for its own taxes and staff.

**6.11 Disputes.** Both parties will try to settle any dispute by talking first. If that fails, either party may take it to small claims court or mediation in the county where the services are performed. This agreement is governed by the laws of the state where the services are performed.

**6.12 Entire agreement.** This document is the whole agreement between the parties. Any change must be in writing (email is fine) and accepted by both. If one part of the agreement can't be enforced, the rest still applies.

## 7\. Signatures

By signing, both parties agree to the terms above.

Name

Signature

Date

**Contractor**

 

**Client**

 

[Edit it online](https://www.fieldmox.com/templates/service-contract?trade=roofing#builder) Download Word

## What to put in a roofing contract

1.  01
    
    ### Name the materials exactly
    
    Write the shingle brand, product line and color, plus the underlayment, ice and water shield, drip edge and ventilation. "Architectural shingles" alone leaves room for a cheaper product and a dispute.
    
2.  02
    
    ### Price rotten decking per sheet
    
    You can't see the decking until the old roof is off. Give a per-sheet price for replacing damaged plywood or OSB so the client knows the cost before you find it, and say you'll show them the damage.
    
3.  03
    
    ### Separate the two warranties
    
    The manufacturer warrants the shingles; you warrant the installation. Say how long your workmanship warranty lasts and what voids it, such as other trades walking on or cutting into the roof.
    
4.  04
    
    ### Handle insurance claims carefully
    
    If the job is an insurance claim, say the client is responsible for their deductible and that the price follows the approved scope, with supplements added by change order. Some states restrict roofers from negotiating claims or waiving deductibles, so check yours.
    
5.  05
    
    ### Cover weather and the open roof
    
    Say you won't tear off more than you can dry in the same day and that you'll protect the roof if weather stops work. Weather delays should move the schedule, not change the price.
    
6.  06
    
    ### Promise the cleanup
    
    Clients care about nails in the driveway. Say you'll protect landscaping, use a dumpster or trailer, and run a magnetic sweep of the yard and driveway when you finish.
    

## Questions

What should be in a roofing contract?

Both parties and the property address, the exact materials (brand, line, color), the scope from tear-off to cleanup, the price, the payment schedule, how damaged decking is priced, permits, the timeline and weather, the manufacturer and workmanship warranties, how changes are approved, the cancellation terms and signatures.

How much deposit should a roofer ask for?

Many roofers ask for 10% to 50% upfront to order materials, with the rest due on delivery and completion. Some states cap the deposit a contractor can take on home improvement work, so check your state's limit before you set it.

Can a homeowner cancel a roofing contract?

Often, yes, within a short window. The FTC cooling-off rule gives buyers 3 business days to cancel many sales made at their home, and several states give extra cancellation rights for roofing or insurance claim contracts. After that window, the contract's own cancellation terms apply.

What warranty should a roofing contract include?

Two: the manufacturer's warranty on the shingles and other products, and your own workmanship warranty on the installation. Workmanship warranties commonly run 2 to 10 years. Say how long yours is and what isn't covered.

Is this roofing contract template free?

Yes. Download it as Word or PDF with no sign-up, or open it in the online builder to add your business and client details, change the services and prices, and edit any clause first.

Is this contract legally binding?

A contract is generally binding when both parties agree to clear terms and sign it. This template is a practical starting point, not legal advice: rules on deposits, cancellation rights, late fees and licensing vary by state, so check it against your state's rules, or have a local attorney review it, before you rely on it.

## Contract templates for other trades

-   [Lawn care contract](https://www.fieldmox.com/templates/service-contract/lawn-care)
-   [Cleaning contract](https://www.fieldmox.com/templates/service-contract/cleaning)
-   [Commercial cleaning contract](https://www.fieldmox.com/templates/service-contract/commercial-cleaning)
-   [Landscaping contract](https://www.fieldmox.com/templates/service-contract/landscaping)
-   [Snow removal contract](https://www.fieldmox.com/templates/service-contract/snow-removal)
-   [HVAC contract](https://www.fieldmox.com/templates/service-contract/hvac)
-   [Pest control contract](https://www.fieldmox.com/templates/service-contract/pest-control)
-   [Pool service contract](https://www.fieldmox.com/templates/service-contract/pool-service)
-   [Handyman contract](https://www.fieldmox.com/templates/service-contract/handyman)
-   [Painting contract](https://www.fieldmox.com/templates/service-contract/painting)
-   [Electrical contract](https://www.fieldmox.com/templates/service-contract/electrical)
-   [Plumbing contract](https://www.fieldmox.com/templates/service-contract/plumbing)
-   [Pressure washing contract](https://www.fieldmox.com/templates/service-contract/pressure-washing)
-   [Tree service contract](https://www.fieldmox.com/templates/service-contract/tree-service)

Need something general? [Start from a blank service agreement](https://www.fieldmox.com/templates/service-contract).

## Run the job after the contract is signed

Fieldmox runs quotes, scheduling, the technician app and invoicing in one place. The signed contract sits on the job with the quote and photos, your crew sees the work on their phone, and the deposit and final invoice come from the same job.

[Book a meeting](https://www.fieldmox.com/book)
